8
PERIODIC MAINTENANCE
GENERAL
Due to the safety concerns involved with working at heights and working with electricity, we recommend the
householder follow the maintenance schedule provided below. Other maintenance should be performed by a
suitably qualified person, such as a Clean Energy Council (CEC) accredited installer.
Modules supplied by Solahart have been designed for easy maintenance. Normal rainfall should naturally
clean the modules. The need for cleaning will vary with the location of the installation, amount of rainfall,
pollution and inclination of the modules.
RECOMMENDED MAINTENANCE SCHEDULE
Maintenance Action
Frequency
Remarks
Under daylight conditions check that your
inverter is operating correctly (refer to the
Inverter manual for details).
If your inverter is equipped with a
display screen, error messages
appearing on the screen indicate
system malfunctioning.
If your inverter has no display screen,
refer to the table below for LED signal
explanation.
Weekly
If not operating correctly, contact your Solahart
dealer.
If you have an internet connected system,
log in to your inverter manufacturer’s web
portal and check that your system is
operating, data has been logged and
communication has been maintained.
Ensure that the contact details of the PV
system owner or responsible officer are up
to date to ensure that inverter fault
notifications are delivered.
Monthly
If you are unable to log in or your system is not
operating correctly, contact your Solahart
dealer.
Visual
inspection
of
PV
system
components from ground level, to check
for:
Accumulation of debris around
components.
Shading of the array.
Visible damage to any components.
Cleanliness of PV modules.
Quarterly
Gently remove debris from components that
are safely accessible from ground level.
Trim trees, if required.
To
optimize
electrical
output,
it
is
recommended that the modules are cleaned
when dirt can be seen on the glass surface.
Please contact your Solahart dealer to arrange
module cleaning.
Contact a suitably qualified person, such as
a CEC accredited installer, to inspect the
system.
Yearly
This inspection can be arranged through your
Solahart dealer, and should ensure that:
Inverter’s ventilation filters and fans are
cleaned.
All fastenings are tight, secure and free
of corrosion.
All cable connections are tight, secure
and free of corrosion.
Cables are not damaged in any way.
Earthing of the modules and module rails
is satisfactory.
Electrical characteristics are within
specification.
Summary of Contents for PV Series
Page 10: ...10 ENGINEERING CERTIFICATION ...
Page 11: ...ENGINEERING CERTIFICATION 11 ...
Page 12: ...ENGINEERING CERTIFICATION 12 ...
Page 13: ...ENGINEERING CERTIFICATION 13 ...