14
Parts required for this step / Pièces requises pour cette étape :
ASSEMBLY ASSEMBLAGE
© Sojag inc. 2015
IMPORTANT:
Always install the shelter on a level platform, wood or concrete.
IMPORTANT :
Toujours installer la structure sur une surface de niveau.
Step 3
3.1 Install the short ogees (B and C) between two
columns (A) using the screws (T1) on the outside
of the ogee and the screws (B2) on the inside
of the ogee.
Repeat with the long ogees (D and E).
Étape 3
3.1 Installer les moulures courtes (B et C) entre deux
colonnes (A) en utilisant les vis (T1) à l’avant des
moulures ainsi que les vis (B2) à l’arrière des moulures.
Répéter avec les moulures longues (D et E).
CAUTION:
Three people are required for this step.
AVERTISSEMENT :
Trois personnes sont requises pour cette étape.
X
8
X
2
T1
X
8
A
B2
B2
T1
T1
D
E
E
D
A
B2
B
B
B
C
C
C
A
T1
B2
X
16
Summary of Contents for 853274
Page 13: ...13 Sojag inc 2015 K4 K4 E C E C E C D B D B D B A2 A2 T1 X2 A2 T1 X2 ...
Page 17: ...17 Sojag inc 2015 X2 F F2 G F G G F H X4 D B C E D E B C ...
Page 19: ...19 Sojag inc 2015 V V V T T T U U U S S S H2 A2 H2 H2 X4 A2 X4 ...
Page 21: ...21 Sojag inc 2015 A A A A A A2 X4 S U V U V S T T 1 1 1 1 1 ...
Page 23: ...23 Sojag inc 2015 X8 X8 A2 A2 K3 M N M N C2 D2 A2 C2 M M M N N N N M ...
Page 25: ...25 Sojag inc 2015 X8 X16 X8 O P Q R E2 E2 U1 U1 V1 1 1 1 1 U2 A2 A2 2 2 2 2 2 ...
Page 29: ...29 Sojag inc 2015 X2 X2 S S A2 A2 I J O P 1 1 1 2 2 2 ...
Page 31: ...31 Sojag inc 2015 Q R K L X2 Q L X2 R K ...
Page 33: ...33 Sojag inc 2015 X6 X6 L A2 T S V U A2 O P Q R O P R Q ...
Page 37: ...37 Sojag inc 2015 X4 D1 A2 1 1 1 1 1 ...
Page 39: ...39 Sojag inc 2015 X6 C1 C1 C1 C1 C1 A2 A2 C1 C1 C1 X6 1 1 1 1 1 1 1 ...
Page 41: ...41 Sojag inc 2015 A1 A2 B1 B1 ...
Page 43: ...43 Sojag inc 2015 THIS SIDE UP CE CÔTÉ VERS LE HAUT E1 F1 J1 C1 D1 J1 F1 F1 E1 E1 C1 D1 ...
Page 47: ...47 Sojag inc 2015 THIS SIDE UP CE CÔTÉ VERS LE HAUT H1 G1 I1 C1 D1 H1 H1 I1 G1 G1 ...
Page 52: ...Printed in China Imprimé en Chine www sojag ca ...