44
Parts required for this step / Pièces requises pour cette étape :
ASSEMBLY ASSEMBLAGE
© Sojag inc. 2015
Step 19
19.1 Install the roof support bars (L1, K1 and M1)
according to the picture. Ensure they are
completely inserted into the tracks.
19.2 Align the middle roof support bars (K1) with roof
support bars (L1 and M1).
CAUTION:
Ensure the roof panels are inserted into the track of
the roof support bars (L1, K1 & M1).
MISE EN GARDE :
S’assurer que les panneaux de toit soient insérés dans les rails
des barres d’insertion de toit (L1, K1 et M1).
Étape 19
19.1 Installer les barres de support de toit (L1, K1
et M1) en se référant à l’illustration. S’assurer
qu’elles soient complètement insérées dans
les
rails.
19.2 Enligner les barres d’insertion de toit (K1) avec
les barres d’insertion de toit (L1 et M1).
K1
X
2
L1
X
4
M1
X
4
Summary of Contents for 853274
Page 13: ...13 Sojag inc 2015 K4 K4 E C E C E C D B D B D B A2 A2 T1 X2 A2 T1 X2 ...
Page 17: ...17 Sojag inc 2015 X2 F F2 G F G G F H X4 D B C E D E B C ...
Page 19: ...19 Sojag inc 2015 V V V T T T U U U S S S H2 A2 H2 H2 X4 A2 X4 ...
Page 21: ...21 Sojag inc 2015 A A A A A A2 X4 S U V U V S T T 1 1 1 1 1 ...
Page 23: ...23 Sojag inc 2015 X8 X8 A2 A2 K3 M N M N C2 D2 A2 C2 M M M N N N N M ...
Page 25: ...25 Sojag inc 2015 X8 X16 X8 O P Q R E2 E2 U1 U1 V1 1 1 1 1 U2 A2 A2 2 2 2 2 2 ...
Page 29: ...29 Sojag inc 2015 X2 X2 S S A2 A2 I J O P 1 1 1 2 2 2 ...
Page 31: ...31 Sojag inc 2015 Q R K L X2 Q L X2 R K ...
Page 33: ...33 Sojag inc 2015 X6 X6 L A2 T S V U A2 O P Q R O P R Q ...
Page 37: ...37 Sojag inc 2015 X4 D1 A2 1 1 1 1 1 ...
Page 39: ...39 Sojag inc 2015 X6 C1 C1 C1 C1 C1 A2 A2 C1 C1 C1 X6 1 1 1 1 1 1 1 ...
Page 41: ...41 Sojag inc 2015 A1 A2 B1 B1 ...
Page 43: ...43 Sojag inc 2015 THIS SIDE UP CE CÔTÉ VERS LE HAUT E1 F1 J1 C1 D1 J1 F1 F1 E1 E1 C1 D1 ...
Page 47: ...47 Sojag inc 2015 THIS SIDE UP CE CÔTÉ VERS LE HAUT H1 G1 I1 C1 D1 H1 H1 I1 G1 G1 ...
Page 52: ...Printed in China Imprimé en Chine www sojag ca ...