42
Parts required for this step / Pièces requises pour cette étape :
ASSEMBLY ASSEMBLAGE
© Sojag inc. 2015
E1
X
4
F1
X
4
J1
X
2
CAUTION:
One side of the roof panels is UV protected. Ensure that the UV
protected side is facing up. It is a very important procedure;
if not followed as described, your roof will not be covered by
the warranty.
NOTE:
The roof panels are covered with a plastic film identifying which
side has a UV protector. Once the plastic film is removed it
is impossible to know which side has the UV protector. We
recommend removing the film one at a time just prior to
installing the roof panel.
MISE EN GARDE :
Un des côtés du panneau de toit a une protection UV. S’assurer
d’exposer le côté protégé contre les rayons UV du soleil vers
l’extérieur de l’abri. Cette étape est très importante, si elle n’est
pas respectée telle que décrite, le toit ne sera pas couvert par
la garantie.
NOTE :
Les panneaux de toit sont recouverts d’une pellicule de plastique
identifiant le côté ayant une protection UV. Une fois que cette
pellicule est enlevée, il est impossible d’identifier quel côté est
protégé contre les rayons UV du soleil. Il est recommandé de
retirer les pellicules de plastique une à la fois, avant l’installation
de chacun des panneaux.
Étape 18
18.1 Installer les panneaux de toit gauche (F1) et les panneaux
de toit droit (E1) tel qu’illustré en les glissant dans les
rails des barres de toit (C1 et D1).
18.2 Insérer les panneaux de toit du centre (J1) à partir du
bout de le la barre de toit du centre (C1) au milieu du côté
de 14 pieds du solarium.
18.3 Enligner la base du panneau de toit du centre (J1) avec
la base du panneau de toit de gauche (F1) et la base du
panneau de toit droit (E1). Cela peut demander que les
panneaux de toit du centre (J1) ne soient pas poussés
complètement au fond des rails.
Répéter cette étape tout le tour de l’abri.
Step 18
18.1 Install the left roof panel (F1) and the right roof
panel (E1) according to the picture, by sliding
into the tracks of roof bars (C1 and D1).
18.2 Insert middle roof panel (J1) from the end of the
middle roof bars (C1) in the middle of the 14 ft.
side of the shelter.
18.3 Align the base of middle roof panel (J1) with
bases of the left roof panel (F1) and the right
roof panel (E1). This may require that middle roof
panel (J1) not be completely pushed to the back
of the tracks.
Repeat this step all around the unit.
Summary of Contents for 853274
Page 13: ...13 Sojag inc 2015 K4 K4 E C E C E C D B D B D B A2 A2 T1 X2 A2 T1 X2 ...
Page 17: ...17 Sojag inc 2015 X2 F F2 G F G G F H X4 D B C E D E B C ...
Page 19: ...19 Sojag inc 2015 V V V T T T U U U S S S H2 A2 H2 H2 X4 A2 X4 ...
Page 21: ...21 Sojag inc 2015 A A A A A A2 X4 S U V U V S T T 1 1 1 1 1 ...
Page 23: ...23 Sojag inc 2015 X8 X8 A2 A2 K3 M N M N C2 D2 A2 C2 M M M N N N N M ...
Page 25: ...25 Sojag inc 2015 X8 X16 X8 O P Q R E2 E2 U1 U1 V1 1 1 1 1 U2 A2 A2 2 2 2 2 2 ...
Page 29: ...29 Sojag inc 2015 X2 X2 S S A2 A2 I J O P 1 1 1 2 2 2 ...
Page 31: ...31 Sojag inc 2015 Q R K L X2 Q L X2 R K ...
Page 33: ...33 Sojag inc 2015 X6 X6 L A2 T S V U A2 O P Q R O P R Q ...
Page 37: ...37 Sojag inc 2015 X4 D1 A2 1 1 1 1 1 ...
Page 39: ...39 Sojag inc 2015 X6 C1 C1 C1 C1 C1 A2 A2 C1 C1 C1 X6 1 1 1 1 1 1 1 ...
Page 41: ...41 Sojag inc 2015 A1 A2 B1 B1 ...
Page 43: ...43 Sojag inc 2015 THIS SIDE UP CE CÔTÉ VERS LE HAUT E1 F1 J1 C1 D1 J1 F1 F1 E1 E1 C1 D1 ...
Page 47: ...47 Sojag inc 2015 THIS SIDE UP CE CÔTÉ VERS LE HAUT H1 G1 I1 C1 D1 H1 H1 I1 G1 G1 ...
Page 52: ...Printed in China Imprimé en Chine www sojag ca ...