SOFAR 3K~6KTLM-G2
User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
- 2 -
The customer must make sure the operator has the necessary skill and
training to do his/her job. Staff in charge of using and maintaining the equipment
must be skilled, aware and mature for the described tasks and must have the
reliability to correctly interpret what is described in the manual. For safety
reason only a qualified electrician, who has received training and / or has
demonstrated skills and knowledge in construction and in operation of this unit,
can install this inverter. Shenzhen SOFARSOLAR Co., Ltd does not take any
responsibility for the property destruction and personal injury because of any
incorrect use.
Installation requirements
Please install inverter according to the following section. Fix the inverter on
an appropriate object with enough load bearing capacity (such as walls, PV racks
etc.), and ensure that inverter is vertical placed. Choose a place suitable for
installing electrical devices. And assure there is enough fire exit space,
convenient for maintenance. Maintain proper ventilation to ensure enough air
cycle to cool the inverter.
Transport requirements
If you find packing problems that may cause the damage of the inverter, or
find any visible damage, please immediately notice the responsible
transportation company. You can ask solar equipment installation contractor or
Shenzhen SOFARSOLAR Co., Ltd for help if necessary.
Transport of the equipment, especially by road, must be carried out with by