background image

 5 

ASSEMBLY 

4– FIXATION OF THE GOAL 

(x4) 

 

NECESSARY 

ITEMS 

 

Lifting ring 

M12x40 

Chemical fixing 

M12x50 

Anchor 

x2 

Lif

ting

 r

ing

  

M

12

x4

0

 

 

x2 

C

he

m

ic

al

 f

ix

ing

 

M

12

x5

0

 

x1 

A

nc

ho

rs

 

CONNECTION BAR 

Summary of Contents for S16233

Page 1: ...alized The owner of this equipment must usually control the product For an optimal use of our products we advise to follow the installation and maintenance instructions MAINTENANCE The equipment has to be regularly maintained by the owner It is recommended to Check every week that all the bolts are correctly tightened Fix paint defects if the unit has been damaged using the adapted paint specified...

Page 2: ...e block 250 250 250 Dig the holes for the footing of the anchors according to the written dimensions Realize the footing with concrete CPJ45 dosed by 350 kg and wait at least 72 hours 6 days during winter Once the concrete is in the hole put the anchor s tubes Drill the holes for the chemicals fixings by using a concrete drill diameter 16 mm Do not drill a hole more than 80mm Rear footing 250x250x...

Page 3: ...x8 Chemical fixing M12x50 x4 Anchors SS Screws M10x30 x24 x32 SS Washers 10 x8 SS Screws M10x70 NECESSARY ITEMS 1 ASSEMBLY OF THE ARCHES TO THE FRAME x4 STEP 2 STEP 1 POST SS Screws M10x30 SS Washers 10 SS Screws M10x30 SS Washers 10 POST SS Screws M10x30 x6 x6 SS Washers 10 RUBBER SUPPORTS ...

Page 4: ...ITEMS CONNECTION BAR ARCH x1 SS Washer 10 x1 SS Screws M10x70 SS Screw M10x70 SS Washer 10 RUBBER SUPPORTS RUBBER SUPPORTS 3 ASSEMBLY OF THE UPPER CONNECTION BAR x4 NECESSARY ITEMS CONNECTION BAR ARCH x1 SS Washer 10 x1 SS Screws M10x70 SS Screw M10x70 SS Washer 10 ...

Page 5: ...5 ASSEMBLY 4 FIXATION OF THE GOAL x4 NECESSARY ITEMS Lifting ring M12x40 Chemical fixing M12x50 Anchor x2 Lifting ring M12x40 x2 Chemical fixing M12x50 x1 Anchors CONNECTION BAR ...

Page 6: ... bubbles cardboard 2 layers 19 3080x130x130 A6 S16326 05 A Connection bars 2 Plastic bubbles cardboard 2 layers 19 3080x130x130 A7 S16233 09 A Accessories 1 Cardboard 5 layers 2 350x160x100 ACCESSORIES PUT IN CLEAR PVC BAG Package N Ref Designation Description Qty Note A7 BITH1030 LITA102220 SS Screws M10x30 SS washers 10 24 24 Assembly of arches to front frame A7 BITH1070 LITA102220 SS Screws M10...

Page 7: ... self tapping screws M4 8x19 12 12 Fixation to arch A1 A2 NNV80 PVC cap 80 4 Fixed on posts A3 A6 TC05 Rubber supports 100x50x5mm 12 A1 A2 BITH1040 SS Screws M10x40 4 Fixation stabilizer bar A1 A2 Conformity stickers 2 A1 A2 Stabilizer bar 2 To maintain the goal during transportation VISA PACKING DEPARTMENT DATE PACKING LIST HANDBALL MOBILE GOAL FOR COMPETITION PRODUCT REF S16233 Index A PAIR ...

Reviews: