background image

 

NOMENCLATURE 

Package 

 

Ref 

 

Index 

Designation

 

Description 

Quantity

 

Packing method

 

Weight 

(kg) 

Dim. 

(mm) 

A1 

S16231-01 

Front frame 

 

Plastic bubbles 

+ cardboard 5 

layers 

40  3200x2100x100 

A2 

S16231-01 

Front frame 

 

Plastic bubbles 

+ cardboard 5 

layers 

40  3200x2100x100 

A3 

S16326-03 

R&L arch 

 

Plastic bubbles 

+ cardboard 2 

layers 

29  2100x1240x220 

A4 

S16326-03 

R&L arch 

 

Plastic bubbles 

+ cardboard 2 

layers 

29  2100x1240x220 

A5 

S16326-05 

Connection bars 

 

Plastic bubbles 

+ cardboard 2 

layers 

19 

3080x130x130 

A6 

S16326-05 

Connection bars 

 

Plastic bubbles 

+ cardboard 2 

layers 

19 

3080x130x130 

A7 

S16233-09 

Accessories 

 

Cardboard 5 

layers 

350x160x100 

ACCESSORIES PUT IN CLEAR PVC BAG

 

Package

N° 

Ref 

 

Designation  

Description  

 

Qty 

Note 

A7 

BI 

LITA 

SS Screws        

SS washers 10  

 

24 + 24 

Assembly of arches 

to front frame 

A7 

BI 

LITA102220

 

SS Screws       

SS washers 10             

 

8 + 8 

Fixation of joining bar 

A7 

T      

S16340EZ  

Chemical anchors M12x50 

+ lifting rings M12x40 

 

8 + 8 

Goal anchoring 

A7 

S16328EZW-01 

Anchors 50x50 

 

Goal anchoring 

PACKING LIST 

HANDBALL MOBILE GOAL FOR 

COMPETITION 

PRODUCT REF

 

S16233 Index A 

PAIR

 

Summary of Contents for S16233

Page 1: ...alized The owner of this equipment must usually control the product For an optimal use of our products we advise to follow the installation and maintenance instructions MAINTENANCE The equipment has to be regularly maintained by the owner It is recommended to Check every week that all the bolts are correctly tightened Fix paint defects if the unit has been damaged using the adapted paint specified...

Page 2: ...e block 250 250 250 Dig the holes for the footing of the anchors according to the written dimensions Realize the footing with concrete CPJ45 dosed by 350 kg and wait at least 72 hours 6 days during winter Once the concrete is in the hole put the anchor s tubes Drill the holes for the chemicals fixings by using a concrete drill diameter 16 mm Do not drill a hole more than 80mm Rear footing 250x250x...

Page 3: ...x8 Chemical fixing M12x50 x4 Anchors SS Screws M10x30 x24 x32 SS Washers 10 x8 SS Screws M10x70 NECESSARY ITEMS 1 ASSEMBLY OF THE ARCHES TO THE FRAME x4 STEP 2 STEP 1 POST SS Screws M10x30 SS Washers 10 SS Screws M10x30 SS Washers 10 POST SS Screws M10x30 x6 x6 SS Washers 10 RUBBER SUPPORTS ...

Page 4: ...ITEMS CONNECTION BAR ARCH x1 SS Washer 10 x1 SS Screws M10x70 SS Screw M10x70 SS Washer 10 RUBBER SUPPORTS RUBBER SUPPORTS 3 ASSEMBLY OF THE UPPER CONNECTION BAR x4 NECESSARY ITEMS CONNECTION BAR ARCH x1 SS Washer 10 x1 SS Screws M10x70 SS Screw M10x70 SS Washer 10 ...

Page 5: ...5 ASSEMBLY 4 FIXATION OF THE GOAL x4 NECESSARY ITEMS Lifting ring M12x40 Chemical fixing M12x50 Anchor x2 Lifting ring M12x40 x2 Chemical fixing M12x50 x1 Anchors CONNECTION BAR ...

Page 6: ... bubbles cardboard 2 layers 19 3080x130x130 A6 S16326 05 A Connection bars 2 Plastic bubbles cardboard 2 layers 19 3080x130x130 A7 S16233 09 A Accessories 1 Cardboard 5 layers 2 350x160x100 ACCESSORIES PUT IN CLEAR PVC BAG Package N Ref Designation Description Qty Note A7 BITH1030 LITA102220 SS Screws M10x30 SS washers 10 24 24 Assembly of arches to front frame A7 BITH1070 LITA102220 SS Screws M10...

Page 7: ... self tapping screws M4 8x19 12 12 Fixation to arch A1 A2 NNV80 PVC cap 80 4 Fixed on posts A3 A6 TC05 Rubber supports 100x50x5mm 12 A1 A2 BITH1040 SS Screws M10x40 4 Fixation stabilizer bar A1 A2 Conformity stickers 2 A1 A2 Stabilizer bar 2 To maintain the goal during transportation VISA PACKING DEPARTMENT DATE PACKING LIST HANDBALL MOBILE GOAL FOR COMPETITION PRODUCT REF S16233 Index A PAIR ...

Reviews: