MASTERYS IP+
40-60 kVA 3/1
IT
ALIANO
ENGLISH
14
IOMMASIPXX07-GB 02
UNPACKING AND INSTALLATION
OF THE UNIT
3
3.6 INSTALLATION PROCEDURES AND INSTRUCTIONS.
WARNING!
Before carrying out work on the terminal board or on UPS internal parts, ensure that the UPS
is switched off , remove the power supply, open the external battery cabinet disconnectors,
isolate the system and wait 5 minutes.
For the power connections to the connecting bars use cables with tinned eyelets only.
3.6-1
3.6-4
L11
N1
L14
N4
L12
N2
AUX MAINS
SUPPLY
OUT TRANSFORMER IN TRANSFORMER
MAINS SUPPLY
L1
L2
L3
N
EXT. BATTERY
+B2
-B2
-B1
+B1
OPEN
OPEN
For systems installed on raised fl oor.
3.6-3
20 cm
90°
A
A
B
B
3.6-2
A. power cables
B. control cables
Power connections.
Summary of Contents for MASTERYS IP+
Page 1: ...INSTALLATION AND OPERATING MANUAL MASTERYS IP 40 60 kVA 3 1...
Page 2: ......
Page 52: ......
Page 53: ...PARALLEL 1 1 REDUNDANT CONFIGURATION MASTERYS IP 40 60 kVA 3 1...
Page 57: ......
Page 58: ......
Page 59: ......