22
Green Po
wer 2.0 600 k
VA
- Ref.: INMGP2601410-GB_12
5. i
nStallation
5.6-1
A
C
B
D
5.6-2
Green Power 2.0
600 kVA
Dimensional tolerances per cabinet: ± 2mm
SPACE REQUIREMENT
ABOVE VIEW
VUE DE DESSUS
ENCOMBREMENT AU SOL
80 mm
75 mm
700 mm
50 mm
600 mm
115 mm
800 mm
47 mm
14
13
14
13
960 mm
40 mm
15
15
80 mm
45 mm
870 mm
620 mm
700 mm
53,5 mm
707 mm
53,5 mm
600 mm
80 mm
650 mm
845 mm
115 mm
75 mm
45 mm
720 mm
80 mm
43,5 mm
620 mm
707 mm
43,5 mm
GRILLE
GRILLE
GRILLE
GRILLE
1
3
4
2
D
EL
PH
YS
Green Power
5. 5. c
abInet
posItIonIng
To make transport and handling easier, the system is separated into cabinets (or cabinet sets).
The
symbol on the front face indicates the
separation points between the cabinets.
The individual cabinet position should corre-
spond with sequence / numbers indicated on
the front view of the system.
(The number of each cabinet is indicated on the
right top corner on the inside of the door).
Note : reference should be made to the technical details in the drawing file.
5. 6. f
IxIng
to
the
floor
(
a
raIseD
floor
or
DIrectly
to
the
floor
)
Each foot of the cabinet needs to be linked up to the metallic mesh network (if the cabinet is on a raised floor) or
to have direct earth bonding (if the cabinet is directly positioned on the floor) by using short links with a cross-
section
≥
35 mm².
Use braidings to connect all the metallic feet of the raised floor and guarantee equipotential cabling.
Each foot has a floor fixing hole (labelled A :
ø 13) and welded nut for level adjusting (labelled B : screw THM