Check  the  height  of  the  area  where  the  lift  is  to  be 
installed.  Clearance  should  be  calculated  based  on 
the full raised height of the lift. 

Failure 

by 

purchaser 

to 

provide  adequate  clearance 
could  result  in  unsatisfactory 

lift  performance,  property  damage,  or  personal 
injury. 

F

LOORING

 

Be certain the concrete floor can properly handle the 
loaded lift. Floor should be in generally good condition 
with no large cracks, spalling or deterioration.  

Minimum requirements for concrete are 4 inches 
minimum  depth,  with  steel  reinforcement,  3500 
psi,  cured  for  28  days  per  local  commercial 
practice

. Floor should be level within 3/8 inch over the 

installation  area.  No  anchors  should  be  installed 
within 8 inches of any crack, edge, or expansion joint. 
If  these  conditions  cannot  be  met,  a  pad  may  be 
poured to accommodate the lift.  
Check  with  local  building  inspectors  and/or  permits 
office  for  any  special  instructions  or  approvals 
required for your installation. 
A  qualified  person  should  be  consulted  to  address 
seismic loads and other local or state requirements. 

Failure 

by 

purchaser 

to 

provide  the  recommended 
mounting surface could result 

in  unsatisfactory  lift  performance,  property 
damage, or personal injury. 

L

OCATION

 

This lift has been evaluated for indoor use only with 
an operating ambient temp. range of 5 – 40°C  (41

 

104°F). Outdoor installation is prohibited. 

E

LECTRICAL 

R

EQUIREMENTS

 

For  lift  installation  and  operation  it  is  necessary  to 
have  a  dedicated  circuit  with  circuit  breaker  or  time 
delay fuse.  Refer to wiring diagram for circuit sizing. 

A

IR 

R

EQUIREMENTS

 

This lift is equipped with an air operated lock release 
system.  

The air supplied to the lift must be clean, 

dry, lubricated, and regulated to 90-120 psi, FRL

 

(

F

ilter/

R

egulator/

L

ubricator).  The FRL must be within 

30  feet  of  lift.   

Failure  to  provide  clean,  dry, 

lubricated,  and  pressure  regulated  air  will  void 
warranty on pneumatic components

S

AFETY 

N

OTICES AND 

D

ECALS

 

For  your  safety,  and  the  safety  of  others,  read  and 
understand  all  of  the  safety  notices  and  decals 
included here. 

R

EAD ENTIRE MANUAL BEFORE ASSEMBLING

,

 

INSTALLING

,

 OPERATING

,

 OR SERVICING THIS 

EQUIPMENT

P

ROPER MAINTENANCE AND INSPECTION IS NECESSARY 

FOR SAFE OPERATION

DO

 

NOT

 OPERATE A DAMAGED LIFT

Safety decals similar to those shown here are found 
on  a  properly  installed  lift.  Be  sure  that  all  safety 
decals have been correctly installed on the Power Unit 
reservoir. Verify that all authorized operators know the 
location  of  these  decals  and  fully  understand  their 
meaning.  Replace  worn,  faded,  or  damaged  decals 
promptly. 

Do  not  attempt  to  raise  a 
vehicle on the lift until the lift 
has  been  correctly  installed 

and adjusted as described in this manual.  
 

 

 

R

ECEIVING

 

The shipment should be thoroughly inspected as soon 
as  it  is  received.  The  signed  bill  of  lading  is 

 

WARNING

WARNING

WARNING

Summary of Contents for EELS540A

Page 1: ...ation Maintenance Manual Two Post Surface Mounted Lift MODELS EELS540A EELS541A EELS743A EELS744A 16 000 LBS CAPACITY 4000 LBS PER ARM 309 Exchange Avenue Conway AR 72032 TEL 800 225 5786 IMPORTANT RE...

Page 2: ...loads equally distributed on all four arms Lifting and lowering speeds may vary depending on the weight of the vehicle A B F C E DRIVE ON DIRECTION 7 8 TO NEAREST OBSTRUCTION OR NEAREST WALL 19 REF 1...

Page 3: ...indoor use only with an operating ambient temp range of 5 40 C 41 104 F Outdoor installation is prohibited ELECTRICAL REQUIREMENTS For lift installation and operation it is necessary to have a dedicat...

Page 4: ...edition IMPORTANT Always wear safety glasses while installing lift TOOLS MINIMUM REQUIRED a Tape measure 16ft b Chalk line c 4ft level d 10 adjustable wrench e Standard open end wrenches 7 16 1 2 2 9...

Page 5: ...height Install the cable on the sheave and slide into place Stack the 3 8 spacer onto the sheave assembly Still holding the sheave assembly slide the pin into place Install the bolt to secure the pin...

Page 6: ...at a time around each column 18 Raise both carriages 400 lbs ea high enough to drill the two inner anchor holes on each column Measure both carriage heights to ensure they are in the same lock positio...

Page 7: ...et with the 10mm dia x 55mm Lg clevis pin hairpin cotter Fig 8 Overhead Bracket Idler Side SYNCHRONIZER CABLES 29 Remove Cable Trapping Hardware at the top of each column Fig 9 Route free end of cable...

Page 8: ...ared fitting off one full turn Again tighten flared fitting finger tight then rotate flared fitting 1 1 2 hex flats 90 deg 31 Mount Power Unit to power column as shown in Fig 11 The mounting hardware...

Page 9: ...wer Side Hose up the column to the lowest available hole of the column extension Insert steel tubing end of the Power Unit Hose into the extension outside in and connect to the tee Leave the assembly...

Page 10: ...dard Width and Height CL16 2 6 Reduced Height without Reduced Width CL16 2 6 or 12 Reduced Width without Reduced Height CL16 2 6 Reduced Height with 6 or 12 Reduced Width CL16 2 12 Reduced Height CL16...

Page 11: ...re the air line to the Idler Column using black wire ties through the double holes in the middle of the column Place the head of the wire tires inside the column Cut the air line to length and attach...

Page 12: ...ig 20 Fig 20 Adapter Rack Installation ELECTRICAL See Figure 21 for the following steps 64 Wire tie Limit Switch cord to Overhead hydraulic Hose and Power Unit Hose 65 Connect the Overhead Limit Switc...

Page 13: ...er rods The cylinders are shipped with a small amount of clear anti corosive lubricant that will be forced out through the wiper when the lift reaches full rise If lubricant is not wiped clean from th...

Page 14: ...16 000LBS 2 Post Lift Installation Operation and Maintenance Page 14 EAZ0080V84A Rev 07 29 2021 Fig 21 Electrical Wiring Diagram 2 T1 1 L1 3 A1 4 A2 LOAD INPUT Normally Open FIELD CONNECTIONS...

Page 15: ...that the lift inspectors are qualified and that they are adequately trained in the inspection of the lift The Owner Employer shall establish procedures to periodically maintain the lift in accordance...

Page 16: ...Test the stability of the vehicle by attempting to rock the vehicle Check adapters for secure contact with vehicle lift points If the vehicle seems unstable lower the lift and readjust the arms If th...

Page 17: ...clean Check for loose or broken parts Check hydraulic system for fluid leaks Check adapters for damage or excessive wear Replace as required with genuine Snap on Equip parts Check lock release activat...

Page 18: ...5 3 4 M6 x 14mm PHILLIPS PAN HEAD SCREW 8 B2065 4 4 M6 SERRATED FLANGE HEX NUT 9 B2065 5 1 CLEVIS PIN 10mm x 55 Lg 10 GJY12 3 1 HAIRPIN COTTER 11 12330 24 1 2 13NC HEX FLG HD C S x 1 Lg 12 12331 24 1...

Page 19: ...16 000LBS 2 Post Lift Installation Operation and Maintenance Page 19 EAZ0080V84A Rev 07 29 2021 PARTS BREAKDOWN continued Fig B Lock Power Idler...

Page 20: ...CK WASHER 29 37119 2 CLEVIS PIN KIT 30 37120 2 ROD END CLEVIS 31 37026 2 AIR CYLINDER 32 37041 2 SWIVEL ELBOW 1 8 PUSH LOCK 33 12088 2 EXTENSION SPRING 34 37042 2 CYLINDER PIVOT ROD 35 37031 4 5 32 SP...

Page 21: ...103 1 HYD TEE 54 12308 1 POWER UNIT HOSE ASSEMBLY 55 AB 81795 1 POWER UNIT SINGLE PHASE AD 81795 1 OPTIONA POWER UNIT THREE PHASE 56 31025 1 LINE CLAMP 57 40085 9 1 4 20 HEX FLANGE NUT 58 A2125 5 1 4...

Page 22: ...67 CL31020 8 WASHER 68 CL31021 4 1 3 8 RETAINING RING 69 12302 0 1 SYNC CABLE PACK 14 6 O A Ht 12302 2 1 SYNC CABLE PACK 16 6 O A Ht 70 40053 2 1 8 THICK BEARING 71 40774 S 2 SHEAVE SPACER 3 8 72 123...

Page 23: ...16 000LBS 2 Post Lift Installation Operation and Maintenance Page 23 EAZ0080V84A Rev 07 29 2021 PARTS BREAKDOWN continued Fig F Carriage 3 Stage Arms...

Page 24: ...T LOCK WASHER 89 12219 8 ARM SHIM 90 12205 8 5 16 24NF x 1 2 Lg SET SCREW 91 B2211 4 6mm x 30mm ROLL PIN 92 B2209 2 ADAPTER RACK 93 A1069 4 5 16 18NC x 1 HEX FLANGE LOCKING HEAD CAP SCREW 94 4100237 4...

Page 25: ...Z0080V84A Rev 07 29 2021 REVISIONS 06 18 2021 NEW PRODUCT RELEASE 07 19 2021 UPDATED IMAGES OVERALL INSTRUCTION AND PARTS BREAKDOWN 07 29 2021 ADDED STEP 55 UPDATED SPEC PAGE 08 30 2021 UPDATED SPEC P...

Reviews: