How to configure the OTS XTrain system*
How to organize threat projections
Activate menu item
Organize threat projections
. The menu illustrated appears.
A list of all available OTS XTrain threat categories and subcategories is displayed. In category
COMB.-
THREAT.IMA.
and its subcategories,
combined complete
threat images*
are contained, in
all
other
categor-
ies,
single
threat objects are stored.
On the right of the category name, the name of the corresponding directory on the hard disk is indicated.
In the last column
Selecting percentage
you are informed
from which categories and at which percentage in propor-
tion to the other categories threat images and threat ob-
jects are projected during the operational flow.
S
Attention!
As an addition to the percentage rate setting, a sufficient number of images of every active category
must be selected and activated accordingly in the IMS Image Store System for the OTS XTrain projec-
tion (
F
2-68)!
If the
Selecting percentage
0%
is set for all categories there will not take place
any projections
! 1700
95587413 01/01/09 © Smiths Heimann
I
The selecting percentages always add
up to 100%. If a category contains sub-
categories, only the images contained in
the subcategories will be projected. Im-
ages contained in the parent category
will not be taken into account, so they do
generally not contain any images.
2-66
Summary of Contents for HI-SCAN 100100T
Page 2: ...95584681 01 01 09 Smiths Heimann ...
Page 4: ...Contents IV 95584681 01 01 09 Smiths Heimann ...
Page 5: ...95584770 01 03 2003 Smiths Heimann 1 ...
Page 6: ......
Page 10: ......
Page 117: ...95584770 01 03 2003 Smiths Heimann 2 ...
Page 118: ......
Page 122: ......