background image

 

Lochinvar ProtoNode Start-up Guide

 

Page 26 of 56

 

7.6 

How to Start the Installation Over: Clearing Profiles  

 

Follow the steps outlined in 

Section

 6 

to access the ProtoNode Web Configurator. 

 

At the bottom-

left of the page, click the “Clear Profiles and Restart” button. 

 

Once  restart  is  complete,  all  past  profiles  discovered  and/or  added  via  Web  configurator  are 
deleted. The unit can now be reinstalled. 

 

 

 

 

 

 

Summary of Contents for Lochinvar FPC-N54-1998

Page 1: ...night XL Armor Wall Mount Wall Hung Crest Copper Fin II Power Fin Knight FTXL Power Fin 2 5 5 0 IPW Armor_1250_4000 To Building Automation Systems BACnet MS TP BACnet IP Modbus TCP IP Metasys N2 and S...

Page 2: ...or technical support of the ProtoNode product MSA Safety does not provide direct support If Lochinvar needs to escalate the concern they will contact MSA Safety for assistance Support Contact Informat...

Page 3: ...2 5 Connect power to ProtoNode 3 pin power port Section 4 5 6 Connect a PC to the ProtoNode via Ethernet cable Section 5 7 Setup Web Server Security and login via web browser Section 6 8 Use a web br...

Page 4: ...ode 20 7 1 Select Field Protocol and Set Configuration Parameters 20 7 2 Setting ProtoNode Active Profiles 21 7 3 Verify Device Communications 22 7 4 Ethernet Network Setting IP Address for the Field...

Page 5: ...ACnet and Metasys N2 48 Appendix C 4 Copper Fin II Modbus RTU Mappings to BACnet and Metasys N2 50 Appendix C 5 Power Fin Modbus RTU Mappings to BACnet and Metasys N2 50 Appendix C 6 Knight FTXL Modbu...

Page 6: ...wing Protocol Selector Parameter 20 Figure 20 Web Configurator Showing no Active Profiles 21 Figure 21 Web Configurator Active Profile Selection 22 Figure 22 Web Configurator Showing Active Profile Ad...

Page 7: ...that indicates that a product has passed a series of rigorous tests conducted by an independent laboratory which verifies that the product correctly implements the BACnet features claimed in the listi...

Page 8: ...urations for the supported devices FPC N54 Connectivity Diagram The ProtoNode can connect with the SMC Cloud The SMC Cloud allows technicians the OEM s support team and MSA Safety s support team to re...

Page 9: ...N54 1998 Figure 1 ProtoNode Part Numbers FPC N54 units have the following 3 ports RS 485 Ethernet RS 485 RS 232 3 2 Point Count Capacity The total number of points presented by the device s attached...

Page 10: ...Modbus RTU Baud Rate 19200 9600 Parity None None Data Bits 8 8 Stop Bits 1 2 Figure 4 COM Settings 3 3 2 Set Node ID for Any Device Attached to the ProtoNode Set Node ID for any device attached to Pr...

Page 11: ...trip connect Pin B RS 485 to A RS 485 on the ProtoNode s R1 3 pin Phoenix connector The Shield Pin on the terminal strip which is Ground does not need to be grounded to the ProtoNode 4 2 Wiring Field...

Page 12: ...510 ohms which is in line with the BACnet spec It should only be enabled at one point on the bus for example on the field port were there are very weak bias resistors of 100k Since there are no jumper...

Page 13: ...gure 9 Termination resistor is also used to reduce noise It pulls the two lines of an idle bus together However the resistor would override the effect of any bias resistors if connected NOTE The R1 an...

Page 14: ...e added to the power supply of the host system A safety margin of 25 is recommended Figure 10 Required Current Draw for the ProtoNode Apply power to the ProtoNode as shown below in Figure 11 Ensure th...

Page 15: ...xxx network For Windows 10 Find the search field in the local computer s taskbar usually to the right of the windows icon and type in Control Panel Click Control Panel click Network and Internet and...

Page 16: ...e Appendix A 1 for instructions 6 1 Login to the FieldServer The first time the FieldServer GUI is opened in a browser the IP Address for the gateway will appear as untrusted This will cause the follo...

Page 17: ...10 40 50 94 unsafe When the login screen appears put in the Username default is admin and the Password found on the label of the FieldServer NOTE A user has 5 attempts to login then there will be a 1...

Page 18: ...will appear that allows the user to select which mode the FieldServer should use NOTE Cookies are used for authentication NOTE To change the web server security mode after initial setup go to Appendi...

Page 19: ...e Key text into their respective fields If the Private Key is encrypted type in the associated Passphrase Click Save A Redirecting message will appear and after a short period of time the FieldServer...

Page 20: ...otocol specific parameters are only visible when the associated protocol is selected NOTE If Modbus TCP IP was selected and is used for the field protocol skip Section 7 2 Device profiles are NOT used...

Page 21: ...tive Profiles are shown below the configuration parameters The Active Profiles section lists the currently active device profiles including previous Web Configurator additions This list is empty for n...

Page 22: ...Section 3 3 2 Then press the Submit button to add the Profile to the list of devices to be configured Repeat this process until all the devices have been added Completed additions are listed under Ac...

Page 23: ...f 56 7 4 Ethernet Network Setting IP Address for the Field Network Follow the steps outlined in Section 6 to access the ProtoNode Web Configurator To access the FS GUI click on the Diagnostics Debuggi...

Page 24: ...e IP Address of that managed switch router Click the System Restart button at the bottom of the page to apply changes and restart the ProtoNode Unplug Ethernet cable from PC and connect it to the netw...

Page 25: ...ed Node_Offset Node_ID For example if the desired Device Instance for the device 1 is 50 001 and the following is true Device 1 has a Node ID of 1 Device 2 has a Node ID of 22 Device 3 has a Node ID o...

Page 26: ...Profiles Follow the steps outlined in Section 6 to access the ProtoNode Web Configurator At the bottom left of the page click the Clear Profiles and Restart button Once restart is complete all past p...

Page 27: ...he executable file and complete the installation Connect a standard Cat 5 Ethernet cable between the user s PC and ProtoNode Double click on the FS Toolbox Utility and click Discover Now on the splash...

Page 28: ...of the ProtoNode into the web browser or use the FieldServer Toolbox to connect to the ProtoNode Click on Diagnostics Button then click on view and then on connections If there are any errors showing...

Page 29: ...rotoNode Appendix A 4 o Check baud rate parity data bits stop bits o Check Detector ID matches the correct device o Verify wiring o Verify the device was listed under the Web Configurator Active Profi...

Page 30: ...f the FS GUI interface to support for evaluation PWR The power light should always show steady green when connected to a functioning power source RX The RX LED will flash when a message is received on...

Page 31: ...capture utilities are embedded in the FS GUI web interface Starting a diagnostic capture takes a snapshot of the loaded configuration files and a log of all the communications over a specified period...

Page 32: ...ode Start up Guide Page 32 of 56 Step 1 Take a Log o Click on the diagnose icon of the desired device o Ensure Full Diagnostic is selected this is the default NOTE If desired the default capture perio...

Page 33: ...re period to finish then the Diagnostic Test Complete window will appear Step 2 Send Log o Once the Diagnostic test is complete a zip file is saved on the PC o Choose Open to launch explorer and have...

Page 34: ...n the FieldServer FS GUI page Click on Diagnostics in the Navigation panel Go to Full Diagnostic and select the capture period Click the Start button under the Full Diagnostic heading to start the cap...

Page 35: ...e left hand side do the following a Click on Setup b Click on File Transfer c Click on the General tab 5 In the General tab click on Choose Files and select the web img file extracted in step 1 6 Clic...

Page 36: ...as unrestricted access to the ProtoNode The User account can view any ProtoNode information but cannot make any changes or restart the ProtoNode The password needs to be a minimum of eight characters...

Page 37: ...llowing web browsers are supported Chrome Rev 57 and higher Firefox Rev 35 and higher Microsoft Edge Rev 41 and higher Safari Rev 3 and higher NOTE Internet Explorer is no longer supported as recommen...

Page 38: ...Lochinvar ProtoNode Start up Guide Page 38 of 56 Appendix B 7 Physical Dimension Drawing Figure 35 ProtoNode FPC N54 Dimensions R1 Serial Port Power Port R2 Serial Port...

Page 39: ...Address of the ProtoCessor into the web browser or use the FieldServer Toolbox to connect to the ProtoCessor then login to the FieldServer Click on the Diagnostics tab at the top of the screen then c...

Page 40: ...x B 8 1 Change Security Mode Click Security in the Navigation panel Click the Mode desired o If changing the security mode to HTTPS with own trusted TLS certificate follow instructions in Section 6 2...

Page 41: ...ate will only be available if the security mode was previously setup as HTTPS with own trusted TLS certificate Click Security in the Navigation panel Click the Edit Certificate button to open the cert...

Page 42: ...gnostics tab at the top of the screen then click on View in the navigation panel and then on Connections Click Setup in the Navigation panel Click User Management in the navigation panel Check that th...

Page 43: ...curity Group and Password o User details are hashed and salted NOTE Passwords must be at least 10 characters long An algorithm automatically checks the password entered and notes the level of strength...

Page 44: ...ers Click the pencil icon next to the desired user to open the User Edit window Once the User Edit window opens change the User Security Group and Password as needed Click Confirm Once the Success mes...

Page 45: ...rt up Guide Page 45 of 56 Appendix B 9 3 Delete Users Click the trash can icon next to the desired user to delete the entry When the warning message appears click Confirm Figure 43 Setup Users Figure...

Page 46: ...op of the screen then click on View in the navigation panel and then on Connections Click Setup in the Navigation panel Click User Management in the navigation panel Click the Password tab Change the...

Page 47: ...15 DI 15 Louver Proving Switch 2 BI 16 DI 16 Air Pressure Switch Flap Vlv 2 BI 17 DI 17 Blocked Drain Switch 2 BI 18 DI 18 Flame 2 BI 19 DI 19 Run time Contacts BI 20 DI 20 Alarm Contacts 1 BI 21 DI...

Page 48: ...16 DI 16 CH Pump BI 17 DI 17 DHW Pump BI 18 DI 18 Gas Valve BI 19 DI 19 System Pump BI 20 DI 20 Discrete Inputs 1 16 AI 21 AI 21 Discrete Inputs 17 32 AI 22 AI 22 Discrete Inputs 33 48 AI 23 AI 23 Sy...

Page 49: ...6 AI 31 AI 31 Discrete Inputs 17 32 AI 32 AI 32 Discrete Inputs 33 48 AI 33 AI 33 System Cascade Setpoint AI 34 AI 34 System Pump Speed In AI 35 AI 35 Cascade Total Power AI 36 AI 36 Cascade Current P...

Page 50: ...26 Gas Valve 3 BI 27 DI 27 Gas Valve 4 BI 28 DI 28 Discrete Inputs 01 16 AI 29 AI 29 Discrete Inputs 17 32 AI 30 AI 30 Discrete Inputs 33 48 AI 31 AI 31 System Cascade Setpoint AI 32 AI 32 System Pump...

Page 51: ...Boiler 1 Status Code AI 32 AI 32 Boiler 1 Blocking Code AI 33 AI 33 Boiler 1 Lockout Code AI 34 AI 34 Discrete Inputs 49 64 AI 35 AI 35 Configuration AV 36 AO 36 Coils AV 37 AO 37 0 10 Volt Input Rate...

Page 52: ...tasys N2 Point Name BACnet Object Type BACnet Object ID N2 Data Type N2 Address Boiler Enable Room Thermostat 1 Stg 1 BV 1 DO 1 Tank Thermostat Cmd BV 2 DO 2 Manual Reset High Limit 1 BI 3 DI 3 Flow S...

Page 53: ...ACnet Object Type BACnet Object ID N2 Data Type N2 Address Outlet Temperature AI 1 AI 1 Inlet Temperature AI 2 AI 2 Outlet Voltage AI 3 AI 3 Setpoint AV 4 AO 4 Appendix C 9 Armor_1250_4000 Modbus RTU...

Page 54: ...26 AI 27 Lockout Code Member 1 AI 27 AI 28 Lockout Code Member 2 AI 28 AI 29 Lockout Code Member 3 AI 29 AI 30 Lockout Code Member 4 AI 30 AI 31 Lockout Code Member 5 AI 31 AI 32 Lockout Code Member...

Page 55: ...sing Figure 46 Specifications Appendix D 1 1 Compliance with UL Regulations For UL compliance the following instructions must be met when operating ProtoNode The units shall be powered by listed LPS o...

Page 56: ...on which original identification marks have been removed or altered This Limited Warranty also will not apply to interconnecting cables or wires consumables or to any damage resulting from battery lea...

Reviews: