10 Specification for Option V
10 - 2
10-3
How to perform maintenance
The product needs to be maintained. Clean it in the following procedure periodically.
1) Close the ball valve.
2) Press the test switch and make the residual pressure zero.
3) Remove the strainer and clean it.
4) Reassemble the strainer and open the ball valve.
Power supply voltage of dryer
AC115V
AC230V
AC460V
Order number (service parts)
IDF-S0199
IDF-S0198
IDF-S0302
Max. operating pressure
240psig (1.6MPa)
Fluid Drain
Power supply voltage of drain timer
AC115V±10%
(60Hz)
AC230V±10%
(60Hz)
AC230V±10%
(60Hz)
ON time
0.5sec
OFF time
0.5min
ON
OFF
ON:SEC
OFF:MIN
0.5
2
4
6
8
10
0.5
1
2
3
4
5
Built-in strainer
Ball valve
Test switch
Strainer lid
IDF-S0199 (AC115V)
IDF-S0198 (AC230V)
KQ2L11-04S (Thread Symbol"N")
KQ2L10-04S (Thread Symbol"None")
3/8 (Thread Symbol"N")
φ10 (Thread Symbol"None")
IDF-S0302 (AC230V)