4 Maintenanc
e
4 - 3
9.
The drain tube is installed according to original. After the
cock is closed of Residual Pressure Release Cock, the
drain tube is installed according to original Residual
Pressure Release Cock when the cock is opened.
10.
Open the ball valve.