Page 32 of 64
Once you have added your tasks to the schedule, you are ready to
modify the tasks properties
Modifying Tasks within the Schedule
4.
While in the ‘Schedule Properties’ dialog, double-click the task
you wish to modify from the ‘Scheduled Tasks’ section. This
brings up the ‘Schedule Task Properties’ dialog. From here you
are given several options;
a.
Operation on end of task
•
Run next task in schedule:
This option will run the
next task that you’ve added to the schedule once the
task has ended.
•
Restart current task:
This will restart the current task
once it has finished. Use this selection to loop your task
indefinitely.
•
Wait for end of task period and then start next
task in schedule:
Use this Selection if you’ve set a
specific duration for the task.
b.
Duration:
Lets you configure how long you would like the
task to be displayed on your screen. Setting this to 0:0:0
will automatically stop the task once it has ended. This is
primarily used for video and flash movies.
c.
Window:
Lets you configure whether you want your task
to be displayed actual size, maximized, minimized, or
hidden. (figure 9.4)
d.
Use View:
If you are using templates*, this control lets
you select which view to display your task. (figure 9.5)
e.
Click ‘OK’ to save your settings.
*More about templates in section 10.
Summary of Contents for SIGNAGEPRO
Page 9: ...Page 9 of 64 figure 2 1 figure 2 2...
Page 21: ...Page 21 of 64 figure 6 1 figure 6 2 figure 6 3...
Page 22: ...Page 22 of 64 Section 2 Using the SignageServer Software...
Page 37: ...Page 37 of 64 figure 10 2...
Page 39: ...Page 39 of 64 figure 10 4...
Page 44: ...Page 44 of 64 A typical layout using Applica s template creator...
Page 53: ...Page 53 of 64 figure 12 2...