SMA Solar Technology AG
Maintenance and Cleaning
Installation Guide
SB16_21TL-IA-IEN112351
43
8 Maintenance and Cleaning
Check the correct operation of the inverter at regular intervals. Dirt such as dust or pollen can cause
heat concentration that can lead to yield losses. Also check the inverters and the cables for visible
external damage. Undertake repairs if necessary.
8.1 Checking the Electronic Solar Switch for Wear
Check the Electronic Solar Switch for wear before plugging it in. Depending on the shape of the
Electronic Solar Switch, you can estimate the wear on either the metal tongues (shape A) or on the
plastic (shape B).
Result
Measure
☑ The metal tongues in the Electronic Solar
Switch are undamaged and not discolored
(A).
or
☑ The plastic in the Electronic Solar Switch is
undamaged (B).
1. Securely attach the Electronic Solar Switch
handle.
2. Commission the inverter as described in
section 6 "Commissioning" (page 37).
A
B
Summary of Contents for SUNNY BOY 1600TL
Page 2: ......
Page 6: ...Table of Contents SMA Solar Technology AG 6 SB16_21TL IA IEN112351 Installation Guide...
Page 70: ......