Opening and Closing
SMA Solar Technology AG
42
SB16_21TL-IA-IEN112351
Installation Guide
6. If an external DC switch-disconnector is available, connect it.
7. If an Electronic Solar Switch is installed, check it for
wear, as described in section 8.1 "Checking the
Electronic Solar Switch for Wear" (page 43), and
reattach it firmly.
8. Switch on the miniature circuit-breaker.
9. Check whether the display and the LEDs indicate a
normal operating state (see section
6 "Commissioning" (page 37)).
☑ The inverter is now closed and in operation.
NOTICE!
Manipulating the connector in the handle can damage the Electronic Solar
Switch.
The connector within the handle must remain movable in order to ensure proper contact.
Tightening the screw voids all warranty claims and creates a fire hazard.
• Do
not
tighten the connector screw in the Electronic Solar Switch handle.
NOTICE!
The Electronic Solar Switch can be damaged if it is attached incorrectly.
If it is not correctly attached, the Electronic Solar Switch can be damaged by high voltages.
• Plug the handle firmly onto the socket of the Electronic Solar Switch.
• Check that the handle is securely in place.
Summary of Contents for SUNNY BOY 1600TL
Page 2: ......
Page 6: ...Table of Contents SMA Solar Technology AG 6 SB16_21TL IA IEN112351 Installation Guide...
Page 70: ......