SMA Solar Technology AG
Electrical Connection
Installation Guide
SB16_21TL-IA-IEN112351
25
7. Attach the pressure screw or cable gland and the threaded sleeve.
8. Insert the protective conductor PE (green-yellow)
into the screw terminal with the grounding sign on
the socket and tighten the screw.
9. Insert the neutral conductor N (blue) into screw
terminal 1 on the socket and tighten the screw.
10. Insert phase L (brown or black) into screw terminal
2 on the socket and tighten the screw.
11. Leave screw terminal 3 on the socket free.
12. Make sure the wires are securely connected.
Size used
Procedure
PG13.5
• Push the sealing ring into the
fastening case.
• Slide the PG13.5 pressure
screw and the fastening case
including the sealing ring
over the AC cable.
• Slide the threaded sleeve
over the AC cable.
PG16
• Slide the PG16 cable gland
over the AC cable.
• Slide the threaded sleeve
over the AC cable.
Summary of Contents for SUNNY BOY 1600TL
Page 2: ......
Page 6: ...Table of Contents SMA Solar Technology AG 6 SB16_21TL IA IEN112351 Installation Guide...
Page 70: ......