Loosen vacuum breaker to valve.
Mount fixture
Pull flush connection forward through wall.
Pre-install escutcheon and fittings in the following order:
1. Wall trim plate
2. Coupling
3. Friction ring
4. Gasket
5. Escucheon
Connect coupling (2) to spud, wrench tight.
Slide wall trip plate against wall.
Re-connect vacuum breaker to valve.
H
5
4 3 2
1
7
FOR REAR SPUD URINALS
F, K
F
G
H
I
J
K
L
FOR FLOOR MOUNT REAR SPUD FIXTURES (WATER CLOSET)
Adjustable Tube
Coupling
nut
Poly washer
Elbow
Taper towards
elbow
Coupling nut
A
B
Cut F-1 flush connection to length as needed for particular rough-in.
• Consult rough-in
Connect F-1 flush connection and adjustable tube to the elbow
using coupling and poly washer. Apply Loctite® to tube, tighten
coupling securely.
F-1 Flush Connection
Poly Washer
C
Insert V-651 vacuum breaker into V-560-A vacuum breaker casing.
Attach to valve hand tight.
Attach flush connection to vacuum breaker.
D
E
For hardwire use only: insert conduit and tightly secure it to the wall
box. Run transformer wires through the conduit to the wall box.
NOTE: TRANSFORMER NOT PROVIDED. IT IS VERY
IMPORTANT THAT THE OUTPUT VOLTAGE OF THE
TRANSFORMER BE 6VAC FOR THE UNIT TO FUNCTION
PROPERLY. SLOAN EL-386 OR EL-451 IS RECOMMENDED.
Finish wall. Use supplied mud guard to protect valve during finishing
process.
• Use two (2) mounting screws, if needed, to hold mud
guard to wall box
• Use the marks on mud guard to make sure finished wall
is between 3 ¼” and 4 ¼” from the center line of the pipe.
Vacuum Breaker
V-560-A vacuum
Breaker casing
Flush Connection
Wall
opening
1
. If needed, trim urinal flush tube.
2
. Slide 3/4" coupling over urinal flush tube.
If cutting tube, thread adapter first, then cut. After
cut, remove adapter to help chase/clean threads.
3
. Thread brass flange onto urinal flush tube.
Amount of thread engagement will depend on rough-in.
Use provided Loctite to secure and seal flange.
4
. Apply Loctite to tube threads (completely around tube)
where flange will sit on tube. Then thread flange into Loctite.
Ensure Loctite is visible on both sides of flange. Allow time
for Loctite to "set", approx. 30 minutes. #4.5 Slide F2
coupling over urinal connection tube, and then install urinal
connection tube to urinal spud and tighten spud coupling.
5
.
Secure urinal flush tube to elbow using
1-1/2” gasket and friction ring.
2
3
2
3
2
3
Adjustable
Tube
Taper toward
elbow
Coupling nut
Coupling
nut
Poly
washer
Elbow
Note:
Wall plate opening must be a
minimum 7-3/8” wide x 8-3/8” tall
(187 mm wide x 213 mm tall) to
maximum 7-5/8” wide x 8-5/8” tall
(194 mm wide x 219 mm tall)
H.
Finish
wall. Use supplied mud guard to protect
valve during finishing process.
• Use two (2) mounting screws, if needed, to hold
mud gaurd to wall box.
• Use the marks on mud guard to make sure
finished wall is between 3 1/4" and 4 1/4" from the
center line of the pipe.
NOTE: wall plate opening must be a minimum 7-3/8"
wide x 8-3/8" tall (187 mm wide x 213 mm tall) to
maximum 7-5/8" wide x 8-5/8" (194 mm wide x 219
mm tall).
1
. Hang urinal on mounting bracket.
2
. Loosen vacuum breaker to valve.
3
. Make spud connection behind the wall.
4
. Re-connect vacuum breaker to valve.
2, 4
3
Loctite must cure for
24 hours before turning
on water; otherwise the
Loctite will wash out
and joint will leak.