Pre-delivery Checklist
�.......... Propeller is fastened correctly to the shaft.
�.......... Propeller turns freely in tunnel.
�.......... Primer and anti-fouling have been applied to the gear house and propeller but NOT on the
anode or the gear house lid where the propeller is fastened.
�.......... Correct drive direction as per control panel.
�.......... The bolts holding the thruster are tightened correctly.
�.......... The bolts holding the motor to its bracket are tightened correctly.
�.......... All electrical connections are clean, dry and tight, and the correct cable, fuse and main
switch size.
�.......... No water leakage around hull penetrated studs
�.......... Check that there is no electrical connection between the electro motor body and positive
terminal on the motor, and between the electro motor body and the negative (A1) terminal
on the motor with an ohm meter.
The thruster has been installed as per the instructions in this manual and all points in checklist above have been controlled.
Signed: .........................................................................................
Date: .............................................................................................
Extra pre-delivery tests by installer / yard who does not use other quality control systems !
Thruster type: ................................................................................................................................................................................................
Serial number:...............................................................................................................................................................................................
Date of delivery:.............................................................................................................................................................................................
Correct drive direction as per control panel: ..................................................................................................................................................
The compartment for the thruster has been isolated from general bilge water and has no obvious or suspected risks for flooding:
......................................................................................................................................................................................................................
......................................................................................................................................................................................................................
......................................................................................................................................................................................................................
Other comments by installer: ........................................................................................................................................................................
.......................................................................................................................................................................................................................
.......................................................................................................................................................................................................................
......................................................................................................................................................................................................................