
18
5927
7
2021
-
SRP 300
Control Panel Cable Installation
EN
•
All Sleipner control panels can be used in any combination.
•
All control panels can be installed using:
• Y-connectors - for standard on/off
• T-connectors - for S-link proportional power system.
(NB: If two or more control panels are operated at the same time in opposite directions, the electronic control box will stop the thruster until
it receives a single signal or thrust in one direction.)
•
Sleipner on/off equipment it is entirely “plug & play” and require no additional confi guration setup.
See the Control panel manual for more information.
MC_0041
!
Please refer to the graphic for special considerations relating to your model
!
MG_0106
**Setup with automatic
main switch
**Setup with manual
main switch
Controller
M
+
-
12V
5A
red
black
yellow
Terminator
120 ohm
Terminator
120 ohm
Retract
panel
Power supply
cable
Retract
thruster
Controller
6 1242
T-connector
T-connector
T-connector
Ac
tu
at
or
Battery
+12V
Automatic
Main Switch
w/S-link
8730
Foot
Switches
( opt.)
Remote control
(opt.)
optional
optional
M
+
-
12V
5A
red
black
yellow
Terminator
120 ohm
Terminator
120 ohm
Retract
panel
Power supply
cable
Retract
thruster
Controller
6 1242
T-connector
T-connector
T-connector
Ac
tu
at
or
Battery
+12V
8730
Foot
Switches
( opt.)
Remote control
(opt.)
Manual main switch
Main fuse
Supply Voltage
7-31 VDC, Powered
at B+ & B-
Power consumption Less than 1.5 Watt in
standby
Fuse @ 12V
40 Amp
Fuse @ 24V
40 Amp
Minimum Voltage at
B+/B- for deploy-
ment
11.7 Volt for 12 Volt
thruster
23.4 Volt for 24 Volt
thruster
Operating temper-
ature
-10°C to 60°C (14°F
to 140°F)
Weight
500g/17,6oz