![Sleipner SE-IP100 Installation Manual Download Page 15](http://html.mh-extra.com/html/sleipner/se-ip100/se-ip100_installation-manual_1292891015.webp)
15
2653
11
2021
-
SE IP 100 & SE IP 130
MG_0071
PORT
STARBOARD
S
P
SE80
FASTEN
18 Nm
(13.28 lb/ft)
SE120
FASTEN
33 Nm
(24 lb/ft)
Tunnel
centre line
Boats
centre line
Bow
Stern
1
STARBOARD
PORT
B
OW
Tunnel
centre line
Boats
centre line
B
ØC
ØA
Measurement
Description
mm
inch
ØA
34
1.33
B
28
1.1
ØC
9
0.35
SE 100
mm
inch
47
1.85
40
1.57
12
0.43
SE 130
SE 170
B
OW
Gasket
Ensure propeller
turns without
obstruction
5
BOW
BOW
BOW
Apply MS Polymer
sealant or equal to
both sides of the
gasket
Motor bracket
IMPORTANT
Do not apply sealant to
the holes.
6 - 7
2 - 4
8
Propeller Installation
MC_0018
!
Please refer to the graphic for special considerations relating to your model
!
1. Centre the drive pin and Insert the propeller onto the shaft spine. Rotate the propeller until the drive pin aligns with the internal slot in the
propeller.
2. Insert the washer to the end of the shaft spline. Tighten with the propeller lock-nut.
3. Insert the anode to the end of the propeller and tighten the anode holding screw. Apply a thread glue (Loctite 243 or similar) to ensure that the
anode holding screw does not unscrew itself from during the rotation of the propeller.
4. Apply anti-fouling to the gear leg and propeller. Do not apply anti-fouling to any rubber elements of the gear leg or anodes.
MG_0033
Drive Pin
Propeller
Washer
Lock Nut
Anode
Anode Holding
Screw
Apply Loctite 243 or similar
Anti-fouling