5
3. ATTACHING YOUR ZIPLINE
The installation should only be performed by an adult and in accordance with these instructions.
Your
course cable comes with protective tubing for the bark of your tree.
•
STEP 1:
Loop cable around the Start Point Tree.
• Fully extend the turnbuckle and attach one turnbuckle end to the sling cable ends with the nut and bolt.
See install overview diagram on pg. 6.
• Take the looped eye end of the main cable and attach it to the other end of the turnbuckle (with the nut
and bolt).
• Unwind the course cable along the zipline course removing any twists.
• Thread the cable through the trolley, below the two trolley bearings and above the grips shaft.
• Wrap the sling cable end around your Finish Point tree.
SLOPING COURSE ATTACHMENT HEIGHT GUIDELINE
General Set Up:
Start point Height for Course (space between trees)
Course Length:
30.5 m 27 m 24 m 21 m 18 m 15 m 12 m 9 m
End Point
Initial Set Up
Start Point (In.):
335 cm 320 cm 305 cm 290 cm
274 cm 259 cm 244 cm
229 cm
198 cm
Maximum Slope
Height Reduction:
137 cm 122 cm 107 cm 91 cm 76 cm 61 cm 46 cm 30 cm
198 cm
*Every course is different, examine the course clearances so the riders feet do not drag near the end of the course
Start Point
Finish Point
60 cm
of drop