04
IMPORTANT
Metalúrgica Siemsen is NOT RESPONSIBLE for any damage caused when
using NOT ORIGINAL spare parts.
2. INSTALLATION and PRE OPERATION
2.1 Installation
To achieve a good performance the Blender shall be installed on a steady and
flat surface about 850 mm above the floor .
The Blender has been designed for 110 V or 220 V voltages . Check the
voltage , to be sure the electric source has the same voltage indicated on the label
placed on the cord .
The cord plug has three round pins, one of them is ground. It is mandatory to
have the three pins properly connected to the power source .
2.2 How to assemble the Blender Cup
2.2.1 –
Put Rubber Sealing Ring Nº 01 on Central
Bearing Nº 02, Pic. (02)
2.2.2 –
Fit the Central Bearing Nº 02 + Rubber
Sealing Ring Nº 01 on the Cup Base Nº 03, Pic. (02)
2.2.3 –
Screw the Cup Nº 4 on the Cup Base
Nº 03, Pic. (02).
04
01
02
03
Pic.02
0
05
5
2.3 PRE OPERATION
What to do and what not to do with your Milk Shake Mixer.
You have to:
.... Check the voltage before to switch ON the blender. Use only the voltage
indicated on the blender base .
.... Check if the machine is firm The supporting surface must be clean and dry to
avoid water or dirt to be aspired along with the air .
.... Put liquid ingredients inside the cup first, then put solid ingredients.
....Cut all fruits, vegetables, boiled meat, fish or sea food in pieces of up to 2cm
size. Cut cheese in pieces of up to 1,5cm size.
.... Use a rubber spatula to push ingredients into the liquid . ONLY with
machine SWITCHED OFF.
....Place the Lid on top of the Cup firmly before switching the machine ON and
keep your hand over the lid while the blender motor is working.
Summary of Contents for LT-1,5 BAR
Page 2: ......
Page 3: ...SUMMARY INDICE 1 ENGLISH 01 2 ESPA OL 13 LT 1 5 BAR...