TURBINE INSTALLATION
Please follow the instructions supplied
with your turbine.
If you install a turbine larger than 10kg,
you will need to cut the lugs of turbine
to fit the rail. Also move the turbine
forward to almost touch front spar.
Shorten or remove middle inlet to clear
turbines. Cool air must past turbine to cool
tailpipe.(64,65)
Run all turbine wires and power cables
on opposite side of servo wires.
Always secure all wires in harness. I would suggest you install a FOD.
This will save you money in the long run.
Install fuel pump close to UAT. We recommend to make use of a mechanical shut
off valve as well.
Secure all Festo pipes with cable ties.
Install NiCad or Li Po battery in nose. I always put a fuse holder inline with power
cable.
Repeat this for other turbine. Mark L&R equipment so you know exactly what ecu
and what valves control what turbine.
P-22
Assembly & Operation Manual
Photo 63
Photo 64
Photo 65