TURBINE INSTALLATION
NOTE: 3 versions can be ordered. 1. Single MID 2. Twin Tail 3. Twin MID. Mid turbine can
only be removed once the bottom wing removed. Access hatch for monitor startup only.
ñ
Please follow the instructions supplied with your turbine.
ñ
The F4 can be configured for twin turbine or single turbine operation.
ñ
The angles are factory set. Mount parallel to turbine rails.
We show the twin tail installation. This option do not need any tail pipe.
For mid installation a tail pipe is required.
ñ
Use FOD screens. Secure all wires and cables and pipes. We recommend to make
use of a mechanical shut off valve as well.
ñ
Install Le Fe / Li Po battery in nose for correct CG.
ñ
The tail cones will twist and lock.