16.2 INSTALLATION AND FINAL ACCEPTANCE REPORT FOR THE CLIMBING
PROTECTION DEVICE
(Part 2 must be sent to the system manufacturer!)
Building/structural equipment
Address:
Order No.:
Type of building:
Remarks:
Sold-to party
Name:
Contact person:
Address:
Tel.:
Installer
Name:
Head installer:
Address:
Tel.:
Climbing protection system
Manufacturer:
Model/type:
Serial numbers:
Mounting type:
Anchor:
□
Injection anchor:
□
Screw anchor:
□
Clamped
connection:
□
Machine bolts:
□
Checklist:
yes
no
n/a
Substrate as expected (no doubt about the bearing capacity)
¨
¨
¨
Proof of bearing capacity is available
¨
¨
¨
Installation performed according to the
installation instructions from the system manufacturer
¨
¨
¨
Connection systems installed according to the
specifications of the respective manufacturer
¨
¨
¨
Only corrosion-proof fasteners were used
¨
¨
¨
All fittings photographed showing their number plate
¨
¨
¨
Installation drawing stored on site
¨
¨
¨
Identification label(s) is/are present and attached
¨
¨
¨
Pretension correct (only for cable systems)
¨
¨
¨
System is free of debris and the runner moves freely
¨
¨
¨
Runners handed over to the operator
¨
¨
¨
A test ascent was carried out and the test was passed
¨
¨
¨
System has been installed and handed over free of defects
¨
¨
¨
Installation and operating instructions are complete and
¨
¨
¨
have been handed over to the operator
Additional information
¨
¨
¨
Comments from head installer: