MAT-MA-0035_GB SKYTAC
Version as of: 13/02/2018
page 35 of 37
Defects, irregularities and deviations from the checklist must be entered here
Handed over to:
(Operator or representative)
Name in block capitals
Signature
Construction site manager of the installation company _______
Name in block capitals
Signature
Location:
Date: