Airflow:
1/
In general
, all Skyline Energy dual-compressor, top draught,
hydrocarbon hydronic heatpumps require at least 2m clearance on two
sides.
2/
There should be no large objects within 2 meters above the fans.
3/
Fresh air flow is critical... You must avoid the possibility of waste cold air
back-feeding to the unit and driving down its efficiency.
4/
Do not place trellis over the fans... If the unit must be hidden, then it is
best to use louvers.
5/
Do not place the heatpump under eaves, under the building, in a garage,
or any other confined space.
Summary of Contents for SX-20BZA
Page 3: ......
Page 4: ......
Page 9: ...Buffertanks Skyline Energy 200Lt 3 zone buffertank dimensions April 2019...
Page 10: ...Buffertanks continued Skyline Energy 200Lt 2 zone buffertank dimensions April 2019...
Page 11: ...Buffertanks continued Skyline Energy 100Lt 2 zone buffertank dimensions April 2019...
Page 13: ......
Page 14: ......
Page 19: ...Typical installation diagram...
Page 23: ...Skyline Energy 200Lt buffertank Stainless Steel 2 zone or 3 zone...
Page 24: ...Typical 200Lt 2 zone buffertank installation...
Page 25: ...Typical V model heatpump installation...
Page 27: ...Typical V model heatpump installation Typical V model heatpump installation...
Page 29: ...Part 1 Operating panel introduction 1 Display interface 2 Buttons function Clock M power...