
Recommended clearances:
For SX-20BZA/SX-21ZA – SX-26ZA-Models:
Notes:
This plan is a guide only.
It assumes that two sides are closed
No more than two sides should be closed
Overhanging structures such as eaves should be avoided
Waste cold air must not be allowed to back-feed into the heatpump
Access must be provided for service
If only one side is closed then the 500mm clearance can be reduced to 300mm
Summary of Contents for SX-20BZA
Page 3: ......
Page 4: ......
Page 9: ...Buffertanks Skyline Energy 200Lt 3 zone buffertank dimensions April 2019...
Page 10: ...Buffertanks continued Skyline Energy 200Lt 2 zone buffertank dimensions April 2019...
Page 11: ...Buffertanks continued Skyline Energy 100Lt 2 zone buffertank dimensions April 2019...
Page 13: ......
Page 14: ......
Page 19: ...Typical installation diagram...
Page 23: ...Skyline Energy 200Lt buffertank Stainless Steel 2 zone or 3 zone...
Page 24: ...Typical 200Lt 2 zone buffertank installation...
Page 25: ...Typical V model heatpump installation...
Page 27: ...Typical V model heatpump installation Typical V model heatpump installation...
Page 29: ...Part 1 Operating panel introduction 1 Display interface 2 Buttons function Clock M power...