Page 76
December 2007
Rough Terrain Scissors
Labels
Section 5
No. Label Pictorial
Description
16
Operator’s Daily Inspection
Refer to the operating manual. Perform visual inspection and
function tests at the beginning of each shift.
Refer to Table 4.8 Maintenance and Inspection Schedule.
17
Horizontal Load Rating*
Apply no more than the indicated side load. Operate below
indicated wind speed only.
*Rating will change over varying units.
18
How to engage maintenance support for inspection or
maintenance.
Refer to operating manual.
1. Remove all material from platform.
2. Raise platform until there is adequate clearance to swing down
maintenance support.
3. Swing maintenance support down from storage bracket
into a vertical position. Lower platform until the bottom end of
maintenance support rests on the lower cross bar.
4. Maintenance support is now secured.
(A) Turn main power disconnect switch to off position.
(B) Perform inspection/maintenance.
5. Turn main power disconnect switch to on position.
6. Raise platform until there is adequate clearance to swing up
maintenance support.
7. Swing maintenance support up and place into storage bracket.
8. Ensure platform is fully lowered.
19
Lift and Tie Down Points
Only use these points for lifting or tying down.
20
Hydraulic Oil ATF Dexron III
Replace hydraulic fluid with ATF Dexron III only.