213210AAAA
SJ46 AJ, SJ51 AJ, SJ63 AJ
66
Section 5 – Operation
Operate with the emergency power switch at the platform control console
5.21 Operate with the
emergency power switch
at the platform control
console
This switch enables all of the functions, with the
exception of drive, if there is an engine malfunction.
Refer to
Section 6.1
for the emergency-lowering
procedure.
5.22 Engage or disengage the
differential lock switch
1.
Move the
differential lock
switch forward and
release it to lock or unlock the differential.
5.23 EcoStart
1.
The EcoStart functionality ONLY shuts down the
engine under all of these specific conditions:
▪
The engine coolant temperature is more
than 70 degrees Celsius
▪
The generator switch is turned off.
▪
No engine powered function from the
platform has been used for more than 3
minutes.
2.
If EcoStart functionality shuts down the engine
the light illuminates. If required to use the engine
power, select the start position from the
start/
function enable/emergency power switch
until
the engine starts.
5.24 MEWP shutdown
1.
Select a reasonably well-protected location to
park the MEWP. This location must have a firm,
level surface, clear of obstructions, and traffic.
2.
Fully retract the boom and lower the platform.
3.
Push the
emergency-stop
button on the
platform control console.
4.
Exit the platform.
5.
Turn the
base/off/platform key
switch to the off
position and remove the key.
6.
Push the
emergency-stop
button on the base
control console.
7.
Turn the
main power disconnect
switch to the
off position.
8.
If it is necessary, put a cover on the platform
control console to prevent damage to
the warning labels and controls in hostile
environments.
5.25 Generator (optional
equipment)
To start the generator:
1.
Make sure the engine is on.
2.
Turn the
generator on/off
switch to the on
position.
To restore normal operation:
3.
Turn the
generator on/off
switch to the off
position.
5.26 Glazier Tray (optional
equipment)
The glazier tray attaches to the kickplate of the
platform. Refer to the glazier operation manual for the
correct operation and maintenance.
5.27 Pipe Rack (optional
equipment)
The pipe rack attaches to the kickplate of the platform.
Refer to the glazier operation manual for the correct
operation and maintenance.
Summary of Contents for SJ46 AJ
Page 1: ...OPERATION MANUAL SJ46 AJ SJ51 AJ SJ63 AJ ARTICULATING BOOMS 213210AAAA December 2019 AS...
Page 4: ...213210AAAA SJ46 AJ SJ51 AJ SJ63 AJ 4 Notes...
Page 14: ...213210AAAA SJ46 AJ SJ51 AJ SJ63 AJ 14 Notes...
Page 20: ...213210AAAA SJ46 AJ SJ51 AJ SJ63 AJ 20 Notes...
Page 76: ...213210AAAA SJ46 AJ SJ51 AJ SJ63 AJ 76 Notes...
Page 77: ...SJ46 AJ SJ51 AJ SJ63 AJ 213210AAAA 77 Section 7 Technical Diagrams and Specifications...
Page 118: ...213210AAAA SJ46 AJ SJ51 AJ SJ63 AJ 118 Notes...
Page 119: ......
Page 120: ...www skyjack com...