Page 50
December 2007
SJIII DC Electric
Guardrail Folding Procedure
Section 3 - Operation
9.
Remove remaining pins from all sides and carefully
fold all guardrails in the following order:
SJIII 32xx
•
Entrance
Fold entrance bar to the left side and lock into
place. Ensure that the detent ball of the pin is all
the way through (
Refer to Figure 3-12c
).
Locking
Pin
Figure 3-12c. Entrance Bar Folded In
•
Right Side
•
Left Side
•
Extension
Lock extension guardrail into place on the
mounting post. Ensure that the detent ball of the
pin is all the way through
(Refer to Figure 3-12d).
Locking
Pin
Figure 3-12d. All Guardrails Folded Down
WARNING
Ensure that you maintain three points of
contact when using the ladder to mount/
dismount platform.
Entrance
Bar
Summary of Contents for 3215 SJIII Compact Series
Page 10: ...Page 10 December 2007 SJIII DC Electric Notes...
Page 34: ...Page 34 December 2007 SJIII DC Electric Notes...
Page 60: ...Page 60 December 2007 SJIII DC Electric Notes...
Page 70: ...Page 70 December 2007 SJIII DC Electric Notes...
Page 103: ......
Page 104: ...Reliable lift solutions by people who care www skyjack com...