SJIII DC Electric
December 2007
Page 43
Section 3 - Operation
Operator’s Responsibility
3.7 Operator’s Responsibility
It is the responsibility of the operator, prior to each work
shift, to perform the following:
1. Visual and Daily Maintenance Inspections
•
are designed to discover any damage of
components before the MEWP is put into
service.
•
are done before the operator performs the
function tests.
WARNING
Failure to locate and repair damage, and
discover loose or missing parts may
result in an unsafe operating condition.
2. Function Tests
•
are designed to discover any malfunctions
before the MEWP is put into service.
IMPORTANT
The operator must understand and
follow the step-by-step instructions
t o t e s t a l l M E W P f u n c t i o n s .
The operator should make a copy of the Operator’s
Checklist (see
Table 4.7
) and fill out the visual and
daily maintenance inspections and the function
tests sections while performing the items outlined in
Section 2.3
and
Section 2.4
.
IMPORTANT
If MEWP is damaged or any unauthorized
variation from factory-delivered condition
is discovered, MEWP must be tagged
and removed from service.
Repairs to the MEWP may only be made by a competent
service technician. After repairs are completed, the
operator must perform visual and daily maintenance
inspections & function tests again.
Scheduled maintenance inspections shall only be
performed by competent service technician (see
Table 4.6
).
Summary of Contents for 3215 SJIII Compact Series
Page 10: ...Page 10 December 2007 SJIII DC Electric Notes...
Page 34: ...Page 34 December 2007 SJIII DC Electric Notes...
Page 60: ...Page 60 December 2007 SJIII DC Electric Notes...
Page 70: ...Page 70 December 2007 SJIII DC Electric Notes...
Page 103: ......
Page 104: ...Reliable lift solutions by people who care www skyjack com...