Page 28
December 2007
SJIII DC Electric
Function Tests
Section 2 - Familiarization
It is the responsibility of the operator to read, completely understand and follow all instructions and warnings
contained in this operating manual and on the aerial platform.
•
Test Platform Raising/Lowering
WARNING
Be aware of overhead obstructions
or other possible hazards around the
MEWP when lifting.
1. Select lift/off/drive switch to “
” lift
position.
2. Activate and hold “
” enable trigger
switch.
3. Push controller handle and raise the
platform to an approximate height of 1/2
meter (2 feet).
Result:
Platform should rise.
4. Pull controller handle and lower the
platform fully.
Result:
Platform should lower.
•
Test Horn
1. Push “
” horn pushbutton.
Result:
Horn should sound.
•
Test Pothole Sensor
WARNING
Ensure that you maintain three points
of contact to mount/dismount platform.
1. Use the ladder to dismount from platform
and place a block, approximately 2 inches
(4 cm), under the hydraulic/electric tray.
2. Use the ladder of MEWP to access
platform.
3. Close the gate.
4. Raise the platform until approximately a
height of 2 meters is reached and attempt
to drive forward or reverse.
Result:
MEWP should not move forward
or backward.
5. Repeat the steps above with block placed
under battery tray.
Result:
MEWP should not move forward
or backward.
FAMILIARIZA
TION
FAMILIARIZA
TION
Platform Control Console
Lift/Drive/Steer Enable
Trigger Switch
Inclined Drive/Level Drive
Switch
Lift/Off/Drive Switch
Horn Pushbutton
Emergency Stop Button/
Operation Light
Controller
Rocker Switch
Summary of Contents for 3215 SJIII Compact Series
Page 10: ...Page 10 December 2007 SJIII DC Electric Notes...
Page 34: ...Page 34 December 2007 SJIII DC Electric Notes...
Page 60: ...Page 60 December 2007 SJIII DC Electric Notes...
Page 70: ...Page 70 December 2007 SJIII DC Electric Notes...
Page 103: ......
Page 104: ...Reliable lift solutions by people who care www skyjack com...