DA 60-820
22
Technical User Guide
3.10 Lead-through in ceiling
.
Make a request for paper templates from the SKOV Service Department to facilitate the cutting.
Use a template that corresponds to the correct roof pitch.
Ceiling pitch
0
5
10
15
20
25
30
35
40
45
Measurement A
in mm
832
835
845
861
885
918
961
1016
1086
1177
Plastic membrane/vapor barrier
Hang up a plumb bob, mark the center, place the tem-
plate and mark up for the hole.
The hole should be cut 30 mm smaller at the plastic
membrane/vapor barrier (see arrow), in order to ensure
a good seal.
Finish with a joint between the duct and the ceiling in the
house.