
8.3.3 Check of visual condition
To be performed by qualified personnel
1
Separate the actuator from the energy supply.
2
Check the following structural components for visible external
damage:
Fig 8
1
Check connecting cables for cracks, cuts and
pinched sections
2
Check hinge hole for cracks, deformation and
broken pieces
3
Check stainless steel tube for scratches and
indentations
3
Notify processor or SKF in case of damage
4
If there is no damage and the processors/manufacturer has not
communicated any concerns, reconnect the actuator to the power
supply.
8.4 Measures after
completed maintenance
Upon completion of the maintenance work, the following steps have
to be performed prior to restarting the actuator.
1
Check all previously loosened screw connections for a tight fit.
2
Ensure that all tools, material and other equipment used during
maintenance have been removed from the work area.
3
Clean work area and remove potential spills such as liquids,
processing material or similar.
4
Ensure that all safety measures of the system work properly with-
out a problem.
5
Check to be sure that all actuator and system functions are
operating correctly.
6
Document the the maintenance in the service log.
3
2
2
1
39