![sitrex QRX 12 Assembly, Use And Maintenance Download Page 25](http://html1.mh-extra.com/html/sitrex/qrx-12/qrx-12_assembly-use-and-maintenance_1285852025.webp)
23
STEP 21
- With reference to Fig. 4.18 (right
side), carry out the operations in the following
order:
1) Attach the throttled nipple (4), the eye fit-
ting (2), washer (1) to the valve (5).
2) Attach the regular (not throttled) nipple (6)
and washer (1) to the valve (5).
3) Attach the assembly thus obtained on the
boss on the rake arm fold-up cylinder
shown in the figure using the bolt (3) and
washers (1).
4) Repeat the same operation on the other
side of the machine.
Pos. Qty. Description
1
8
WASHER 3/8" BONDED
2
2
EYE FITTING 3/8’’
3
2
PERFORATED SCREW FITTING 3/8’’
4
2
THROTTLED NIPPLE 3/8’’ - 3/8’’
5
2
VALVE 3/8’’
6
2
NIPPLE 3/8’’ - 3/8’’
4.18
Summary of Contents for QRX 12
Page 1: ...ASSEMBLY USE AND MAINTENANCE QRX 12 14 201600 ...
Page 2: ......