1 Preparations
Sirona Dental Systems GmbH
Installation Requirements C8
+
60 28 000 D3417
8
D3417.021.04.09.02
båÖäáëÜ
1.3 Supply lines in the termination panel
5
3
6
6
6
7
Center base plate
opening to floor
1
2
4
9
1
3/8
“
min.
500mm
20"
7, 6
max.
60mm
2 3/8"
3
4
5
max.
5mm
3/16"
max.
5mm
3/16"
3/8"
1
2
10
x
1mm
10
x
1mm
3/
8
”
x 1/32
“
3/
8
”
x 1/32
“
1
3/8
“
Foot end
36
.5
m
m
50
m
m
36
.5
m
m
Summary of Contents for c8+ turn
Page 1: ...kÉï ë çÑW MVKOMMV båÖäáëÜ UH fåëí ää íáçå oÉèìáêÉãÉåíë ...
Page 4: ......
Page 48: ......
Page 55: ......