Sirona Dental Systems GmbH
1 Preparations
Installation Requirements C8
+
60 28 000 D3417
D3417.021.04.09.02
9
båÖäáëÜ
•
Observe the national regulations for electrical installa-
tions (e.g. VDE 0100, VDE 0100, Part 710).
•
Observe the national regulations for water supply in-
stallations (e.g. EN 1717, DIN 1988) and sewage instal-
lations (e.g. EN 12056-1).
•
For the suction pipe, observe the instructions in the
Suction Machine Installation Instructions
.
•
For fastening the pipe ends in the installation field, we
recommend using an
installation template.
They can
be ordered from Sirona under
REF 33 15 830
.
If necessary, you can also prepare the template your-
self based on the above sketch (not true to scale!).
Supply lines in the termination panel
Table 1: Supply lines
Item
Description
1
Water inlet
pipe 10x1mm,
corner valve outlet 3/8"
2
Compressed air inlet
pipe 10x1mm, corner
valve outlet 3/8"
3
Suction pipe
DN40 HT-PP DIN 19560 (polypro-
pylene,
inner diameter 36.5mm!
)
4
Water drain
DN40 HT-PP DIN 19560 (polypro-
pylene,
inner diameter 36.5mm!)
5
Installation pipe
, DN40 HT-PP DIN 19560
(polypropylene, 40mm!)
6
Suction machine control cable
(
)and
call
cables
(
) 3x1.5mm
2
7
Power cable
3x1.5mm
2
Fuse: 16A slow-blow
Recommended: Type B automatic circuit breaker
8
not applicable
9
Installation pipe (or corresponding flat duct) for
additional requirement e.g. practice network
connecting cable
,
Summary of Contents for c8+ turn
Page 1: ...kÉï ë çÑW MVKOMMV båÖäáëÜ UH fåëí ää íáçå oÉèìáêÉãÉåíë ...
Page 4: ......
Page 48: ......
Page 55: ......