TRANSPORTING AND LIFTING THE MACHINE
GTZZ14EJ&16EJ Operation Manual
8-3
© Aug 2020
TRANSPORTING THE
MACHINE
Follow these requirements when transporting the
machine by truck or trailer:
1.
Before transport, turn the key switch on ground
controller to OFF, and remove the key.
2.
Perform a thorough inspection of the machine to
prevent loose or untightened components.
3.
Ensure the rope or belt is of sufficient capacity.
4.
Use at least 4 ropes/belts to fasten the chassis and
one rope/belt for the platform.
5.
Adjust the rigging to prevent damage to the rope/
belt.
6.
To protect the boom components and platform load
sensors, do not apply too large a downward force to
the rope/belt fastened near the platform. It is
recommended to add a foam layer beneath the
platform and ensure the platform is suspended in
the air.
Figure 8-3
Summary of Contents for AB14EJ
Page 2: ......
Page 6: ...This Page Intentionally Left Blank...
Page 8: ...This Page Intentionally Left Blank...
Page 12: ...Aug 2020 iv GTZZ14EJ 16EJ Operation Manual This Page Intentionally Left Blank...
Page 30: ...Aug 2020 3 12 GTZZ14EJ 16EJ Operation Manual This Page Intentionally Left Blank SAFETY...
Page 90: ...Aug 2020 A 4 GTZZ14EJ 16EJ Operation Manual This Page Intentionally Left Blank MAINTENANCE...