
144
438371/A
about ..................................................... 124
approval .......................................... 7, 32, 124
creating ........................................... 7, 32, 124
download.................................................. 32
installation ................................................. 7
responsibility .................................... 7, 32, 124
transducer installation ................................... 41
E
clamping ring drawing ................................ 131
description ................................................ 10
dimensions .............................................. 134
mounting arrangement ................................ 135
mounting ring drawing ................................ 128
outline dimensions..................................... 125
electrical noise
acoustic noise........................................ 54–55
requirements .............................................. 16
specifications ........................................... 100
network adapter ........................................ 117
F
acoustic noise............................................. 54
acoustic noise............................................. 46
protruding objects........................................ 47
transducer installation ................................... 38
G
cable ....................................................... 99
cable requirements..................................... 104
H
handling
transducers .................................. 22–23, 61, 69
design, manufacturing and mounting ................. 62
support offices ............................................ 18
connect the synchronization cable to the Power
Supply Unit ............................................. 91
connect the transducer cable ........................... 70
connect the transducer cable to the Power
Supply Unit ............................................. 87
design, manufacture and mount the installation
hardware ................................................. 62
design, manufacture and mount the steel
conduit ................................................... 66
do a visual inspection of the Power Supply
Unit..................................................... 114
install the Power Supply Unit .......................... 81
install the transducer..................................... 72
mount the transducer .................................... 72
prepare a cable for termination....................... 106
pull the transducer cables through the sealing
plate ...................................................... 64
secure and terminate a cable.......................... 107
set to work .............................................. 112
unpack the transducer ................................... 68
use multi-diameter cable sealing................. 77, 108
protruding objects........................................ 47
anti-fouling paints ....................................... 26
I
cable requirements..................................... 105
line socket................................................. 98
important
transducer handling........................ 22–23, 61, 69
concept .................................................... 44
support .................................................... 18
visual inspection of the Power Supply Unit ........ 114
in forward part of hull ................................... 47
installation
clamping ring.................................... 37, 39, 42
drawings.................................................... 7
EC150-3C mounting arrangement................... 135
mounting ring .............................. 37, 39–40, 42
overview .................................................. 30
Power Supply Unit ...................................... 81
requirements for installation personnel ............... 33
summary .................................................. 30
summary of transducer installation.................... 61
tasks ....................................................... 30
about ..................................................... 124
approval .......................................... 7, 32, 124
creating ........................................... 7, 32, 124
download.................................................. 32
design, manufacturing and mounting ................. 62
environmental ............................................ 16
transducer ................................................. 72
list .......................................................... 86
Power Supply Unit ...................................... 96
cable requirements..................................... 103
electrical noise ...................................... 54–55
anti-fouling paints ....................................... 27
network adapter ........................................ 117
Simrad EC150-3C Installation Manual
Summary of Contents for EC150-3C
Page 2: ......
Page 8: ...6 438371 A Simrad EC150 3C...
Page 128: ...126 438371 A Simrad EC150 3C Installation Manual...
Page 129: ...438371 A 127 Related topics Preparations page 29 Installation page 60 Drawing file...
Page 131: ...438371 A 129 Drawing file...
Page 134: ...132 438371 A Simrad EC150 3C Installation Manual...
Page 135: ...438371 A 133 Related topics Preparations page 29 Installation page 60 Drawing file...
Page 138: ...136 438371 A Simrad EC150 3C Installation Manual...
Page 139: ...438371 A 137 Related topics Preparations page 29 Installation page 60 Drawing file...
Page 141: ...438371 A 139 Drawing file...
Page 142: ...140 438371 A Simrad EC150 3C Installation Manual...
Page 143: ...438371 A 141 Related topics Preparations page 29 Installation page 60 Drawing file...
Page 150: ...2019 Kongsberg Maritime...