
Chapter 2: Install the server hardware
17
Procedure
1.
Remove the shrink wrap from the palleted cartons and carefully cut any straps that hold the cartons
to the pallet.
2.
To orient the carton for ease of unpacking and racking, locate the black circle printed on the side of
the carton. This is the front of the system enclosure.
3.
Use a boxcutter to cut the sealing tape. Be careful that you do not cut into the carton. Retain the
carton and packaging in case you need to return the system.
4.
Remove the rail kit (callout 1), which contains the rails and the installation instructions.
Figure 6: OmniCube Shipping Carton Contents
5.
Remove the cable management arm (CMA) kit, (callout 2) which contains the CMA assembly, a
signal LED extension cable, and the installation instructions. Do not open this box until the end of
the installation procedure, when you are ready to organize the system cables.
6.
Remove the accessory pack (callout 3), which contains:
■ SimpliVity bezel.
■ Power and network cables.
■ Software and documentation flash drive.
■
Quick Start
posters and international
Product Information Guide
.