Swift-E / Swift-E+ Load Bank Manual 

 

 

 

 

 
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Watts

 

250

 

500

 

750 

1000 

1250 

1500 

120V 

 

2.1 

4.2 

 

6.3 

 

8.3 

10.4 

12.5 

240V 

2.1 

3.1 

4.2 

5.2 

6.3 

Watts

 

1750

 

2000

 

2250

 

2500

 

2750

 

3000

 

120V 

14.6 

16.7 

18.8 

20.8 

22.9 

25 

240V 

7.3 

8.3 

9.4 

10.4 

11.5 

12.5 

Watts 

3250 

3500 

3750 

4000 

4250 

4500 

120V 

27.1 

29.2 

31.3 

33.3 

35.4 

37.5 

240V 

13.5 

14.6 

15.6 

16.7 

17.7 

18.8 

Watts 

4750 

5000 

5250 

5500 

5750 

6000 

120V 

39.6 

41.7 

43.8 

45.8 

47.9 

50 

240V 

19.8 

20.8 

21.9 

22.9 

24 

25 

Watts 

6250 

6500 

6750 

7000 

7250 

7500 

120V 

52.1 

54.2 

56.3 

58.3 

60.4 

62.5 

240V 

26 

27.1 

28.1 

29.2 

30.2 

31.3 

Watts 

7750 

8000 

8250 

8500 

8750 

9000 

120V 

64.6 

66.7 

68.8 

70.8 

72.9 

75 

240V 

32.3 

33.3 

34.4 

35.4 

36.5 

37.5 

Watts 

9250 

9500 

9750 

10000 

10250 

10500 

120V

 

77.1

 

79.2

 

81.3

 

83.3

 

85.4

 

87.5

 

240V

 

38.5

 

39.6

 

40.6

 

41.7

 

42.7

 

43.8

 

Watts 

10750

 

11000

 

11250

 

11500

 

11750

 

12000

 

120V

 

89.6

 

91.7

 

93.8

 

95.8

 

97.9

 

100

 

240V

 

51

 

52.1

 

53.1

 

54.2

 

55.2

 

56.3

 

Watts 

13750

 

14000

 

14250

 

14500

 

14750

 

15000

 

120V

 

114.6

 

116.7

 

118.8

 

120.8

 

122.9

 

125A

 

240V

 

57.3

 

58.3

 

59.4

 

60.4

 

61.5

 

62.5A

 

Table 2: Current Draw at Specified Wattages 

Summary of Contents for SWIFT-E

Page 1: ...8 June 2018 Simplex Service 800 637 8603 Page 1 of 19 Swift E Swift E Load Bank Manual SWIFT E SWIFT E Portable Load Bank...

Page 2: ...00 637 8603 Page 2 of 19 Swift E Swift E Load Bank Manual This manual was last revised 8 June 2018 For up to date information on this product or others please contact Simplex at 800 637 8603 or on the...

Page 3: ...ion 10 IV A Load Bank Placement 10 IV B Wiring the load bank 10 IV C Meter Setup Information 10 IV D Current Transformer Ratio 11 IV E Meter Display 11 V Operating Instructions 12 V A Startup 12 V B A...

Page 4: ...perator must be familiar with its contents and have access to it during operation High Voltage Turn off and disconnect power source before opening this equipment High Temperature Allow hardware to coo...

Page 5: ...ent If work must be done around an operating unit stand on an insulated dry surface to reduce the risk of electrocution Do not handle any kind of electrical device while standing in water while barefo...

Page 6: ...extinguisher Its fumes are toxic and the liquid can deteriorate wiring insulation Keep the extinguisher properly charged and be familiar with its use If there are any questions pertaining to fire exti...

Page 7: ...loy To reduce the risk of electrical shock and short circuiting of elements the element has a non conductive exterior The element is also rust proof vibration proof and shock proof Swift E load banks...

Page 8: ...43 8 45 8 47 9 50 240V 19 8 20 8 21 9 22 9 24 25 Watts 6250 6500 6750 7000 7250 7500 120V 52 1 54 2 56 3 58 3 60 4 62 5 240V 26 27 1 28 1 29 2 30 2 31 3 Watts 7750 8000 8250 8500 8750 9000 120V 64 6 6...

Page 9: ...spection is recommended before installation and as part of the 50 hour 6 month maintenance schedule or as a load bank is relocated 1 If the crate shows any signs of damage examine the load bank in the...

Page 10: ...e Figure 1 Airflow diagram and ensure the area around the load bank is clear of debris The load bank elements are cooled by dual 135mm fans and the unit operator must make allowances for the hot load...

Page 11: ...ottom display on the meter There are four options Loop which will cycle through three following measurements 1 FrQ which will show the power frequency 2 ACt which will display the load generated measu...

Page 12: ...ep is activated 2 Activate each load step by switching the desired step on This step if done while the Master switch is activated will apply the load instantly For example while the Master switch is a...

Page 13: ...Once the cause has been determined and fixed the load bank is ready to be reconnected and the operation can resume VI B Tripped Circuit Breaker The main breaker will trip and the unit will shut off if...

Page 14: ...nnector Red Accepts 2 0 3 0 and 4 0 cables Up to 600 volts 405 amps Product number 25608721 Male 16 series Cam Lok connector White Accepts 2 0 3 0 and 4 0 cables Up to 600 volts 405 amps Product numbe...

Page 15: ...E Swift E Load Bank Manual Simplex also offers vinyl and hardshell cases Please contact your sales representative or call the Simplex Inc sales department at 800 637 8603 ext 3 Hardshell shipping case...

Page 16: ...more information about resetting the circuit breaker Check control fuses on front of load bank to ensure they aren t blown See page 17 to see where the fuses are located Remove faceplate and check lo...

Page 17: ...8 June 2018 Simplex Service 800 637 8603 Page 17 of 19 Swift E Swift E Load Bank Manual Figure 5 Top of Load Bank 14 20 Figure 6 Front of Load Bank Figure 7 Subpanel 4...

Page 18: ...le Switch 9 14031000 Control Fuses 5A 250V 10 14011000 Control Fuses 2A 250V 11 54885650 Relay Bale 12 24885000 Relay Base Socket 13 24785300 Relay 14 50020220 Relay Base Bracket 15 25130000 Resistor...

Page 19: ...properly maintained f parts supplied by buyer for inclusion in finished equipment are not covered by this warranty g components or assemblies specified by buyer with no substitution permissible that...

Page 20: ...and Fuel Supply needs Simplex Inc Simplex Inc 5300 Rising Moon Road 2100 Boggs Road Springfield IL 62711 Duluth GA30096 800 637 8603 www simplexdirect com This manual and all of its contents Copyrigh...