background image

Simplex, Inc., 5300 Rising Moon Road, Springfield, IL 62711-6228 • 217-483-1600 • Fax 217-483-1616

© 2007 Simplex, Inc. All Rights Reserved. • Printed in the USA. • www.simplexdirect.com

®

LOAD BANK MANUAL • Saturn 3000 DV • W.O. 63798/2 • page 18 of 20

FUSEBLOCKS

MANUF.

WIRE

TORQUE

PART NO.

SIZE

INCH LBS

BM6031SQ,

10-18 AWG

20

BM6032SQ,
BM6033SQ;

600V, 30A

T60060-2SR

10-18 AWG

20

600V, 60A

T60030-3CR,

10-14 AWG

35

600V, 30A

8 AWG

40

T60060-3CR,

4-6 AWG

45

600V, 60A

2-3 AWG

50

60100-3CR,

600V, 100A

MISCELLANEOUS-TERMINALS, METERS,

SWITCHES, COILS, RELAYS, XFORMERS

CONNECTION

TORQUE

SIZE

INCH LBS

4

5

6

10

8

19

10

31

1/4-20”

66

TAPER-LOCK BUSHINGS

 BUSHING NUMBER

TORQUE

1008, 1108

55 IN LBS

1210, 1215, 1310, 1610, 1615

15 FT LBS

2012

23 FT LBS

2517, 2525

36 FT LBS

3020, 3030

67 FT LBS

3535

83 FT LBS

4040

142 FT LBS

4545

204 FT LBS

5050

258 FT LBS

6050, 7060, 8065

652 FT LBS

10085, 12010

1142 FT LBS

CAM-LOK STUDS

THREADED

MAXIMUM

STUD

TORQUE

5/16” – 18

15 FT LBS

1/2” – 13

40 FT LBS

APPENDIX C - TORQUE VALUES CONT’D

Summary of Contents for Saturn 3000 DV

Page 1: ...2550KW 3000KW 480 600V 60KW Res LCL PLC INT EXT CP Powered Louvers File 63798 2 p65 Disk SDCX155 This instruction manual has been reviewed and is approved by me as being fully accurate and representat...

Page 2: ...er 63798 07 43 2 Model Saturn 3000 DV June 2007 The information herein is the property of Simplex Inc and or its subsidiaries Without written permission any copying transmitting to others and other us...

Page 3: ...cation 5 Procedure 6 OPERATION 6 Local 6 Remote 7 Load Dump 8 FAILURE DETECTION 8 Thermocouple Temperature Switch 8 MAINTENANCE 9 Each Operation 9 Every 50 Hours or 6 Months 10 Motor Lubrication 10 TR...

Page 4: ...ation is by magnetic contactor All load branch circuits areprotectedby200 000AICclass T fuses Operating controls are located on a LocalControlPanelandaRemoteCon trol Panel The Control System is com pr...

Page 5: ...safety hazard to the opera tor When a cooling failure occurs the automatic safety features in the Control System immediately remove the load from the load source The malfunction must be corrected and...

Page 6: ...ents con servativelyoperateatapproximatelyhalf the maximum temperature rating of the alloy 1080 Fvs 1920 F Forexample Alloy FeCrAl See Parts Legend Drawing for specific elements used These elements ar...

Page 7: ...in safe operation The Load Bank must be po sitionedandinstalledaccordingtolarge airflow requirements There must be a minimum clearance of6feetonallsidesoftheLoadBank Load Banks installed indoors must...

Page 8: ...Load Bank as shown Consult NEC for proper wire size 8 Place the Disconnect Switch DSW in the On position 9 Place the Fan Circuit Breakers FCB 1A or FCB 1B in the On position OPERATION LOCAL 1 Place th...

Page 9: ...e Off position REMOTE There are three screens on the remote touch panel They are Control Status Screen Load Screen and Metering Screen 1 Press the Activate Remote button 2 Press the Energize Control P...

Page 10: ...ssing these contacts and enabling the load section by flipping the Auto Load Dump switch to the Bypass position This disables the load dump featureandilluminatesthe LoadDump Bypass lamp Metering Scree...

Page 11: ...branches should be checked for blown fuses or opened load resis tors To check the fuses or load resis tors operate the Load Bank from a balanced 3 phase source and check the three line currents The t...

Page 12: ...on caused by Load Bank operation may result in loose con nections Thevibrations caused by the cooling fan may also loosen electricalconnections If the Load Bank is trans ported over the road the elect...

Page 13: ...OTING This section is designed to aid the elec trical technician in basic Load Bank systemtroubleshooting Alloftheprob lems listed can be verified with a basic test meter and or continuity tester For...

Page 14: ...t temp below EXTS setpoint 1 Restriction of air intake or exhaust 2 Fan pressure switch inoperative 3 Overtemperature sensor failure DRAWINGS AND PARTS LIST The drawings included in this manual are th...

Page 15: ...switch used to energize cooling system GFB Ground fault breaker GBTR Ground breaker tripped relay HVR High voltage relay Hz Hertz cycles per second measurement of frequency IFCV Incorrect fan control...

Page 16: ...iply the answer of step 3 times the square root of 3 1 732 5 Dividetheanswerofstep 4by1000 The answer is the actual kilowatts of loadbeingappliedbytheLoadBank Single Phase 1 Determine the line current...

Page 17: ...the desired amount of kilowatts applied at 1 0 power fac tor The following calculations are used to determine a step kilowatt rating at other than a rated voltage This is accom plishedbyreferencingth...

Page 18: ...tts 1 phase Volts x Amps x PF Volts x Amps 1000 1000 3 phase 1 732 x Volts x Amps x PF 1000 Power Factor expressed as decimal Resistive Load Bank PF is 1 0 Amperes 1 phase KW x 1000 KW x 1000 KW known...

Page 19: ...IN LBS 250 1 4 20 Grade 5 dry 8 96 250 1 4 20 Grade 2 dry 5 5 66 312 5 16 Grade 5 dry 17 204 312 5 16 Grade 2 dry 11 132 375 3 8 Grade 5 dry 30 360 375 3 8 Grade 2 dry 19 228 437 7 16 Grade 5 dry 50...

Page 20: ...5 600V 30A 8 AWG 40 T60060 3CR 4 6 AWG 45 600V 60A 2 3 AWG 50 60100 3CR 600V 100A MISCELLANEOUS TERMINALS METERS SWITCHES COILS RELAYS XFORMERS CONNECTION TORQUE SIZE INCH LBS 4 5 6 10 8 19 10 31 1 4...

Page 21: ...ated with Mobil Mobilith AW2 grease a Lithium based grease Lubrication using another grease may cause bearing failure If the lube interval is less than a month use the Weekly Relube Quantity at each r...

Page 22: ...Control 47B164465A PLC Control Wiring 47B164466B Metering 47B164467A Resistive Contactors Coil 47B164468 Load Section 1 of 3 47B164469 Load Section 2 of 3 47B164470 Load Section 3 of 3 47B164471 Load...

Reviews: