4. If you will be using the test source to provide control and fan power, plug the Fan/Control Power
Plug into the receptacle in the cable-storage area in the back of the load bank. If you will be using
external power, plug the Control Power Plug into a 230/460V, 3-phase, 60Hz, 20A receptacle.
5. Using a CAT-5, CAT-5E or CAT-6 ethernet cable, connect the HMI to the main load bank. If other
load banks are connected in Step 3, controllers can be connected to them, but they will only
provide monitoring for the unit they are connected to.
6.
Using the supplied control power cord, connect the HMI controller to the load bank’s receptacle
in the controller mounting area or a 120V, 1-phase, 60Hz outlet.
7. Using the cables provided, connect the load bank to the testing source.
8. Turn the Fan Circuit Breaker on.
Installation -