93
ENG
5. User manual
For a successful installation with Scena, follow these instructions, which will help you to achieve your objective
quickly and successfully.
An installation with Scena may involve a great number of functionalities depending on its requirements:
Creation of Channels
Creation of Groups
Creation of Scenarios
Creation of Sequences
Creation of CLCs
Calendar....
Although not all the above steps are necessary for an installation with Scena. The only vital step is
Creation of Channels
.
For easy programming, you must be sure about the following points:
All the installed loads that will be controlled by Scena
Address of each load installed
The type of load and regulation. (1-10, RGB, ON-OFF)
5.1 Introduction to Scena
Before exploring the user manual, we will detail the most general Scena screens.
Push ON/OFF
Direct access
By pressing
the “list” icon
we access
the System
screen.
Console
standby screen
, by pushing ON/OFF we access
the User’s
Start
screen. This screen enables the user to modi-
fy the
direct accesses
that have been included in this screen
in installer mode (see further on).
*By pressing the “list” icon we access the System screen.
Summary of Contents for Scena
Page 1: ...MANUAL Y GU A DE INSTALACI N SCENA MANUAL AND INSTALLATION GUIDE...
Page 4: ...4 CAST...
Page 17: ...17 CAST 2 2 6 Modulo Regulador 0 10V 2 2 7 Modulo control de Persianas...
Page 60: ...60 CAST 2 Conexionado tipo...
Page 70: ...70 CAST MANUAL AND INSTALLATION GUIDE...
Page 73: ...73 ENG...
Page 86: ...86 ENG 2 2 6 0 10V Regulator Module 2 2 7 Blind control module...
Page 129: ...129 ENG 2 Standard Connection...