User manual - METER SWE-73-L
Connections of measurement signal and relay output are executed using the screw
connections on the back of the unit’s housing.
Figure 4.4. Method of cable insulation replacing and cable terminals
Figure 4.5. Terminals description
Figure 4.6. Connection of 2-wire current converters
9
R
1 2
GND
4-20mA
+
3 4 5
ON
OFF
6-7 mm
m
a
x.
2
m
m
+ -
1 2
24V DC
- +