42
the hub (9), fixing then everything with the
washer (2) and the screw (1).
ASSEMBLY OF THE
1.2.5
ACCESSORIES
The closing handles for the ports and the
screw with the adjustment knob for the blast
gate damper are supplied separately, since
they could be damaged during the transport.
Both the handles and the screws with knob
are packed in a nylon bag, introduced inside
the ash collection basin.
For the assembly of the handles proceed as
following (fig. 4):
– Take a handle (1), insert it in the opening
of the load port (2) and introduce the roll
(3) in the opening of the handle; block the
handle introducing the elastic split pin (4).
– Carry out the same operation for the han-
dle of the ash box port.
To assemble the screw with the knob, pro-
ceed as follows (fig. 5):
– Remove the screw M8 x 60, which fixes
the air blast damper to the ash box port
and screw the screw with the bakelite
knob (1) on, which is supplied in the pack-
aging.
Place the blind nut with cap (2) at the end
of screw M 10.
– Fix lever M6 to the air blast damper (3)
placing it in a horizontal direction on the
right. The lever has an opening at its end,
where the chainlet of the thermostatic reg-
ulator will be connected.
CASING ASSEMBLY
1.2.6
Two superior tie rods are screwed on three
nuts at the front side of the boiler: the second
and the third nut serve to place correctly the
lateral sides of the casing.
Two nuts one to fix the clamp holders for the
lateral sides are screwed on the inferior tie
rods, both from the front side and from the
rear side of the boiler. The assembly of the
casing components has to be carried out in
the following way (fig. 6):
– Unscrew with some rotations the second
or third nut of each tie rod.
– Hook the left side (1) on the lower tie
rod and superior of the boiler and adjust
the position of the nut and locknut of the
upper tie rod.
– Fix the lateral side in blocking the locknut.
– In order to assembly the right side (2) pro-
ceed in the same way.
– Hook the front upper board (3) intro-
ducing the two splines in the opening,
obtained on each side.
– Carry out the same operation to fix the
back lower board (4).
– The protection deflector (5) is fixed to the
control board (6) with three self-threading
screws.
Fix the board by means of the pressure
stakes.
Then unwind the capillary of the ther-
mometer and introduce it in the left sheath
of the posterior head, introducing the con-
tact spring.
The right sheath can be needed for the
check thermometer.
– Fix the cover (7) at the lateral sides of the
boiler.
NOTE: Keep the “Test certification”
together with the boiler documents in the
combustion chamber.
DRAUGHT REGULATOR
1.2.7
The boilers
“SOLIDA PL”
can assemble indif-
ferently 2 types of thermostatic regulators.
NOTE: In order to fix the lever with the
chainlet in the regulator holder it is neces-
sary to remove the deflector in aluminum,
which is assembled on the control board, by
unscrewing the three screws that fix it (fig.
6). Replace the protection deflector after
the assembling and related adjustment.
“THERMOMAT RT-C” Regulator
The “Thermomat” regulator is equipped with
a thermosetting resin knob of an adjustment
field from 30 to 100 °C (fig. 7).
Screw the regulator on the 3/4” opening of
the anterior head and orientate the red index
on the upper part.
The lever with the chainlet should be intro-
duced in the regulator holder after having
assembled the instrument holder board and
after having removed the plastic lock.
If the joint is taken out, which fixes the lever
with the chainlet, take care in assembling
it again in the same position. After having
placed the knob at 60°C, block the lever with
the chainlet in a slightly inclined position
downwards, so that the chainlet will be in
axis with the air gate damper.
For the adjustment of the “Thermomat”,
which essentially consists in the determina-
tion of the chainlet length, proceed in the
following way:
LEGEND
1 Handle
2 Load port
3 Roll
4 Elastic split pin
Fig. 4
LEGEND
1 Screw with knob M10 x 70
2 Blind nut with cap
3 Blast gate damper
LEGEND
1 Left side
2 Right side
3 Posterior superior board
4 Posterior inferior board
5 Protection deflector
6 Control board
7 Cover
Fig. 5
Fig. 6