45
*All installations in England and Wales must be
to Local Authority Building Control (LABC) either directly or through a
Competent Persons Scheme. A Building Regulations Compliance
will then be issued to the customer.
www.centralheating.co.uk
© Heating and Hotwater Industry Council (HHIC)
GAS BOILER SYSTEM COMMISSIONING CHECKLIST
Customer name:
Telephone number:
Address:
Boiler make and model:
Boiler serial number:
Commissioned by (PRINT NAME):
Gas Safe register number:
Company name:
Telephone number:
Company address:
Commissioning date:
CONTROLS
(tick the appropriate boxes)
Time and temperature control to heating
t
a
t
s
o
m
r
e
h
t
m
o
o
r
e
l
b
a
m
m
a
r
g
o
r
P
r
e
m
it
/r
e
m
m
a
r
g
o
r
p
d
n
a
t
a
t
s
o
m
r
e
h
t
m
o
o
R
l
o
rt
n
o
c
t
r
a
t
s
m
u
m
it
p
O
n
o
it
a
s
n
e
p
m
o
c
r
e
h
t
a
e
w
/
d
a
o
L
r
e
li
o
B
n
o
it
a
n
i
b
m
o
C
r
e
m
it
/r
e
m
m
a
r
g
o
r
p
d
n
a
t
a
t
s
o
m
r
e
h
t
r
e
d
n
il
y
C
r
e
t
a
w
t
o
h
o
t
l
o
rt
n
o
c
e
r
u
t
a
r
e
p
m
e
t
d
n
a
e
m
i
T
Heating zone valves
d
e
ri
u
q
e
r
t
o
N
d
e
tt
i
F
Hot water zone valves
d
e
ri
u
q
e
r
t
o
N
d
e
tt
i
F
d
e
ri
u
q
e
r
t
o
N
d
e
tt
i
F
s
e
v
l
a
v
r
o
t
a
i
d
a
r
c
it
a
t
s
o
m
r
e
h
T
d
e
ri
u
q
e
r
t
o
N
d
e
tt
i
F
m
e
t
s
y
s
o
t
s
s
a
p
y
b
c
it
a
m
o
t
u
A
Boiler interlock
Provided
ALL SYSTEMS
’s instructions
Yes
What system cleaner was used?
What inhibitor was used?
Quantity litres
Yes
No
CENTRAL HEATING MODE
measure and record:
Gas rate
m³/hr
OR
ft³/hr
Burner operating pressure (if applicable)
mbar
OR
Gas inlet pressure
mbar
°C
Central heating return temperature
°C
COMBINATION BOILERS ONLY
Is the installation in a hard water area (above 200ppm)?
Yes
No
Yes
No
DOMESTIC HOT WATER MODE
Measure and Record:
Gas rate
m³/hr
OR
ft³/hr
r
a
b
m
)
e
t
a
r
m
u
m
i
x
a
m
t
a
(
e
r
u
s
s
e
r
p
g
n
it
a
r
e
p
o
r
e
n
r
u
B
OR
r
a
b
m
e
t
a
r
m
u
m
i
x
a
m
t
a
e
r
u
s
s
e
r
p
t
e
l
n
i
s
a
G
Cold water inlet temperature
°C
Hot water has been checked at all outlets
Yes
Temperature
°C
I/min
CONDENSING BOILERS ONLY
s
e
Y
8
9
7
6
S
B
/
6
4
5
5
S
B
r
o
/
d
n
a
s
n
o
it
c
u
rt
s
n
i
s
’r
e
r
u
t
c
a
f
u
n
a
m
e
h
t
h
ti
w
e
c
n
a
d
r
o
c
c
a
n
i
d
e
ll
a
t
s
n
i
n
e
e
b
s
a
h
n
i
a
r
d
e
t
a
s
n
e
d
n
o
c
e
h
T
ALL INSTALLATIONS
Record the following:
At max. rate: CO ppm
AND
CO/CO² Ratio
At min. rate: (where possible) CO ppm
AND
CO/CO² Ratio
s
e
Y
s
n
o
it
a
l
u
g
e
R
g
n
i
d
li
u
B
e
t
a
ir
p
o
r
p
p
a
e
h
t
h
ti
w
s
e
il
p
m
o
c
m
e
t
s
y
s
r
e
t
a
w
t
o
h
d
n
a
g
n
it
a
e
h
e
h
T
s
e
Y
s
n
o
it
c
u
rt
s
n
i
s
’r
e
r
u
t
c
a
f
u
n
a
m
e
h
t
h
ti
w
e
c
n
a
d
r
o
c
c
a
n
i
d
e
n
o
i
s
s
i
m
m
o
c
d
n
a
d
e
ll
a
t
s
n
i
n
e
e
b
e
v
a
h
s
t
c
u
d
o
r
p
d
e
t
a
i
c
o
s
s
a
d
n
a
r
e
li
o
b
e
h
T
s
e
Y
r
e
m
o
t
s
u
c
e
h
t
y
b
d
o
o
t
s
r
e
d
n
u
d
n
a
o
t
d
e
t
a
rt
s
n
o
m
e
d
n
e
e
b
e
v
a
h
s
l
o
rt
n
o
c
m
e
t
s
y
s
d
n
a
r
e
li
o
b
e
h
t
f
o
n
o
it
a
r
e
p
o
e
h
T
Y
r
e
m
o
t
s
u
c
e
h
t
h
ti
w
t
f
e
l
d
n
a
d
e
n
i
a
l
p
x
e
n
e
e
b
s
a
h
,
d
r
o
c
e
R
e
c
i
v
r
e
S
d
n
a
t
s
il
k
c
e
h
C
k
r
a
m
h
c
n
e
B
g
n
i
d
u
l
c
n
i
,
e
r
u
t
a
r
e
ti
l
s
’r
e
r
u
t
c
a
f
u
n
a
m
e
h
T
es
Commissioning Engineer’s Signature
Customer’s Signature
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating compliance
with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission according to the manufacturer’s instructions and complete this Benchmark Commissioning Checklist will invalidate the
warranty. This does not affect the customer’s statutory rights.